Inspections for the day of: Tuesday, July 30, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-01952 Final7/30/20197/30/20197/31/2019 9:27:05 AMAPASS
Please call me about 20 minutes before proceeding to site. Thank you. Phone #: ###-#### Inspection requested via web by PAUL PINNEY Ok final. Under counter lighting has 14-2 exposed, but is tucked in behind fixtures in 4 different cabinet location. 334.10(A) Can be used for both exposed and concealed work. City doesn t require protection for island wires feeding outlets, so I would consider this installation no different. Forgot to leave final sticker.
ELE19-02426 Final7/26/20197/30/20197/30/2019 2:16:14 PMAPASS
Trevor Lujan Phone #: ###-#### Inspection requested via web by Same Electric Ok final.
ELE19-00735 Final7/29/20197/30/20197/30/2019 12:54:45 PMAPART
Partial final is for house only, not the B&B in basement. It is fine to move, I have already checked the house, 3/0 blank above mstr tub. A few small things to be fixed by electrician, he is going to notify me when done.
ELE19-00344 Permanent Service7/29/20197/30/20197/30/2019 12:13:57 PMANR
Will you please call when you’re headed? I’d also like to conference on the final electrical. Thanks, Brad Phone #: ###-#### Inspection requested via web by Brad Christensen
ELE19-02497 Electrical Rough-In7/29/20197/30/20197/30/2019 10:08:44 AMAPASS
Von is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Ok cover conduits in elevated wood floor.
ELE19-02813 Electrical Rough-In7/29/20197/30/20197/30/2019 9:37:04 AMAPASS
We will have all material onsite by 9AM. Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok cover. All items UL listed.
ELE19-02789 Rough-In Permanent Service7/26/20197/30/20197/30/2019 9:06:16 AMAPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk p/s o/h n ok
ELE19-02804 Electrical Rough-In7/29/20197/30/20197/30/2019 6:47:18 AMPCANC
Residential remodel. New lighting and switching. Adjusted existing circuits and added 2 new circuits.
Modified grounding system with new grounding electrode conductor and adding 2 ground rods and bond to water line Phone #: ###-#### >> Inspection requested via web by Kurt Carlson Inspection cancelled from web by: Kurt Carlson
ELE14-01014 ELE-Aging Inspection7/30/20197/30/20197/30/2019 5:36:05 AM DONE
Please coordinate a final inspection with corrections made.
ELE16-04136 ELE-Aging Inspection7/30/20197/30/20197/30/2019 5:34:57 AM PART
A partial final was given for house. Kitchen still needs to be completed. Please coordinate and schedule inspection for kitchen.
ELE16-04136 Final7/30/20197/30/20197/30/2019 5:34:48 AMAPART
Partial final for house. Kitchen still needs inspection for a complete final. Coordinate with homeowner.
ELE19-00735 Electrical Rough-In7/29/20197/30/20197/30/2019 5:17:40 AMAPASS
Rough-in inspection for the basement B;B suite Phone #: ###-#### Inspection requested via web by Noah Giver Ok cover. Talked with electrician about a few outlets that may be required. Various areas may have lower cabinets put in place. It will affect outlet layout. These areas will need to be addressed for a final inspection.
ELE19-00735 Final7/29/20197/30/20197/30/2019 5:15:50 AMACANC
Final the main/second floor of the house. Phone #: ###-#### Inspection requested via web by Noah Giver Already gave partial final on 7/29. B&B is not part of final.