BLD19-00527
| BLD-Final | 7/30/2020 | 7/30/2020 | 7/31/2020 12:50:28 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Travis Blackburn//temp occ ok in all units except type A unit until grab bars are installed//fire tape area in fire riser room// all other signatures have been completed for temp occ//discussed handrails and code requirements, they will be fixed//
|
BLD20-01384
| BLD-Final | 7/29/2020 | 7/30/2020 | 7/30/2020 4:43:46 PM | P | PASS |
|
|
Please cal me 30 mins ahead of time so I can meet you there. Phone #: ###-#### Inspection requested via web by Gerome Fries//final complete per scope and plans//
|
BLD20-01294
| BLD-Final | 7/29/2020 | 7/30/2020 | 7/30/2020 4:32:02 PM | P | PASS |
|
|
Bridger *screened* Phone #: ###-####//final is complete//
|
BLD20-02371
| BLD-Final | 7/28/2020 | 7/30/2020 | 7/30/2020 4:31:32 PM | P | CANC |
|
|
Screened- Loretta Phone #: ###-####
|
BLD20-00337
| BLD-Concrete | 7/30/2020 | 7/30/2020 | 7/30/2020 4:18:11 PM | P | PART |
|
|
Screened- slab on grade inspection- Chase Phone #: ###-####//ok pending specials//
|
BLD20-00337
| BLD-Other | 7/30/2020 | 7/30/2020 | 7/30/2020 4:17:47 PM | P | PART |
|
|
Screened- massonary-reba inspection- Chase Phone #: ###-####//ok pending specials//
|
BLD20-02123
| BLD-Wall Bracing | 7/30/2020 | 7/30/2020 | 7/30/2020 1:39:48 PM | P | PART |
|
|
Screened- Kent Phone #: ###-####//ok per plans when hot dip galvanized nails added to PT sill plate//
|
BLD20-01733
| BLD-Wall cover | 7/30/2020 | 7/30/2020 | 7/30/2020 1:17:53 PM | P | PART |
|
|
I Phone #: ###-#### Inspection requested via web by rick pew//sink fur out walls//add bracing to wing walls//demo restroom doorways per the plans//ok when backing is installed for the sinks capable of holding weight of sinks-provide documentation//
|
BLD20-01341
| BLD-Framing/Rough-in | 7/29/2020 | 7/30/2020 | 7/30/2020 11:20:33 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***
//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2// //any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
|
BLD20-01340
| BLD-Framing/Rough-in | 7/29/2020 | 7/30/2020 | 7/30/2020 11:20:16 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***
//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2// //any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
|
BLD20-01339
| BLD-Framing/Rough-in | 7/29/2020 | 7/30/2020 | 7/30/2020 11:15:54 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***
//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2// //any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
|
BLD20-01279
| BLD-Framing/Rough-in | 7/29/2020 | 7/30/2020 | 7/30/2020 11:15:30 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***
//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2// //any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
|
BLD20-01361
| BLD-Framing/Rough-in | 7/29/2020 | 7/30/2020 | 7/30/2020 11:02:02 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***
//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2// //any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
|
BLD20-01360
| BLD-Framing/Rough-in | 7/29/2020 | 7/30/2020 | 7/30/2020 11:01:44 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***
//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2// //any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
|
BLD20-01359
| BLD-Framing/Rough-in | 7/29/2020 | 7/30/2020 | 7/30/2020 11:01:28 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***
//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2// //any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
|
BLD20-01358
| BLD-Framing/Rough-in | 7/29/2020 | 7/30/2020 | 7/30/2020 11:01:08 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***
//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2// //any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
|
BLD20-01360
| BLD-Other | 7/30/2020 | 7/30/2020 | 7/30/2020 10:50:21 AM | P | CANC |
|
|
soffit Sheetrock inspections for both garages, please Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD20-01289
| BLD-Other | 7/30/2020 | 7/30/2020 | 7/30/2020 10:50:00 AM | A | PASS |
|
|
soffits
|
BLD20-01292
| BLD-Other | 7/30/2020 | 7/30/2020 | 7/30/2020 10:49:45 AM | A | PASS |
|
|
soffits
|
BLD20-01237
| BLD-Footing | 7/29/2020 | 7/30/2020 | 7/30/2020 10:41:47 AM | A | FAIL |
|
|
screened // Chuck Phone #: ###-####//need property pins located for setbacks on addition side//footing width needs to be 2 feet per the approved plans plan//install vapor barrier per plans//
|
BLD20-01418
| BLD-Wall Bracing | 7/29/2020 | 7/30/2020 | 7/30/2020 9:40:28 AM | A | PART |
|
|
Clarence * occ, new addition* screened Phone #: ###-####//letter form engineer provided for lateral on front wall and accepted the lateral as is// the L brackets used are not for bearing--please provide correct attachment//add hot dipped galvanized nails to PT or provide documentation from manufacturer regular steel nails are acceptable//ok to wrap//
|