Inspections for the day of: Thursday, July 30, 2020.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-00527 BLD-Final7/30/20207/30/20207/31/2020 12:50:28 PMPPART
Phone #: ###-#### Inspection requested via web by Travis Blackburn//temp occ ok in all units except type A unit until grab bars are installed//fire tape area in fire riser room// all other signatures have been completed for temp occ//discussed handrails and code requirements, they will be fixed//
BLD20-01384 BLD-Final7/29/20207/30/20207/30/2020 4:43:46 PMPPASS
Please cal me 30 mins ahead of time so I can meet you there. Phone #: ###-#### Inspection requested via web by Gerome Fries//final complete per scope and plans//
BLD20-01294 BLD-Final7/29/20207/30/20207/30/2020 4:32:02 PMPPASS
Bridger *screened* Phone #: ###-####//final is complete//
BLD20-02371 BLD-Final7/28/20207/30/20207/30/2020 4:31:32 PMPCANC
Screened- Loretta Phone #: ###-####
BLD20-00337 BLD-Concrete7/30/20207/30/20207/30/2020 4:18:11 PMPPART
Screened- slab on grade inspection- Chase Phone #: ###-####//ok pending specials//
BLD20-00337 BLD-Other7/30/20207/30/20207/30/2020 4:17:47 PMPPART
Screened- massonary-reba inspection- Chase Phone #: ###-####//ok pending specials//
BLD20-02123 BLD-Wall Bracing7/30/20207/30/20207/30/2020 1:39:48 PMPPART
Screened- Kent Phone #: ###-####//ok per plans when hot dip galvanized nails added to PT sill plate//
BLD20-01733 BLD-Wall cover7/30/20207/30/20207/30/2020 1:17:53 PMPPART
I Phone #: ###-#### Inspection requested via web by rick pew//sink fur out walls//add bracing to wing walls//demo restroom doorways per the plans//ok when backing is installed for the sinks capable of holding weight of sinks-provide documentation//
BLD20-01341 BLD-Framing/Rough-in7/29/20207/30/20207/30/2020 11:20:33 AMAFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***

//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2//
//any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
BLD20-01340 BLD-Framing/Rough-in7/29/20207/30/20207/30/2020 11:20:16 AMAFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***

//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2//
//any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
BLD20-01339 BLD-Framing/Rough-in7/29/20207/30/20207/30/2020 11:15:54 AMAFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***

//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2//
//any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
BLD20-01279 BLD-Framing/Rough-in7/29/20207/30/20207/30/2020 11:15:30 AMAFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***

//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2//
//any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
BLD20-01361 BLD-Framing/Rough-in7/29/20207/30/20207/30/2020 11:02:02 AMAFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***

//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2//
//any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
BLD20-01360 BLD-Framing/Rough-in7/29/20207/30/20207/30/2020 11:01:44 AMAFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***

//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2//
//any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
BLD20-01359 BLD-Framing/Rough-in7/29/20207/30/20207/30/2020 11:01:28 AMAFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***

//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2//
//any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
BLD20-01358 BLD-Framing/Rough-in7/29/20207/30/20207/30/2020 11:01:08 AMAFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle***per Carl M. no rated exterior walls or soffits required due to common lots around all garages and the plat***

//provide truss engineering for trusses that appear to have been repaired in the field with gussets//low voltage ELE boxes for garage door sensors in the 2 hr wall, same stud bay will need to be protected per IRC 302.4.2//
//any through penetrations through the 2 hr walls need to be firestop protected in accordance with IRC R302.4.1.2//
BLD20-01360 BLD-Other7/30/20207/30/20207/30/2020 10:50:21 AMPCANC
soffit Sheetrock inspections for both garages, please Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD20-01289 BLD-Other7/30/20207/30/20207/30/2020 10:50:00 AMAPASS
soffits
BLD20-01292 BLD-Other7/30/20207/30/20207/30/2020 10:49:45 AMAPASS
soffits
BLD20-01237 BLD-Footing7/29/20207/30/20207/30/2020 10:41:47 AMAFAIL
screened // Chuck Phone #: ###-####//need property pins located for setbacks on addition side//footing width needs to be 2 feet per the approved plans plan//install vapor barrier per plans//
BLD20-01418 BLD-Wall Bracing7/29/20207/30/20207/30/2020 9:40:28 AMAPART
Clarence * occ, new addition* screened Phone #: ###-####//letter form engineer provided for lateral on front wall and accepted the lateral as is// the L brackets used are not for bearing--please provide correct attachment//add hot dipped galvanized nails to PT or provide documentation from manufacturer regular steel nails are acceptable//ok to wrap//