PLM95-00413
| INSP - Ground work | 7/31/1995 | 7/31/1995 | 8/1/1995 12:00:00 AM | | NR |
|
|
07/31/95 330 - BLDG 22, GRID LINE 1 - NORTHSIDE STORMWORK AND U/G defective material has been replaced but not tested
|
PLM95-00423
| INSP - Framing/ Rough-in | 7/31/1995 | 7/31/1995 | 8/1/1995 12:00:00 AM | | FAIL |
|
|
07/31/95 330 - READY AT 4:30PM correction: water system test failed 2-wc,2-lav,2-tub,1-si,1-wb,1-wh
|
PLM95-00425
| INSP - Water lines | 7/31/1995 | 7/31/1995 | 8/1/1995 12:00:00 AM | | NR |
|
|
07/31/95 330 - DOMESTIC WATER BUILDING #4-RELOCATE 60' OF FIRE LINE AND $3,100.00 VALUE. not ready
|
PLM95-00417
| INSP - Framing/ Rough-in | 7/31/1995 | 7/31/1995 | 7/31/1995 12:00:00 AM | | PASS |
|
|
/ / 330 - r/i ok 2-wc,3-lav,2-tub,1-sink,1-wb,1-wh.
|