MEC96-00666
| INSP - Wood stoves | 7/26/1996 | 7/31/1996 | 7/31/1996 12:00:00 AM | P | PASS |
|
|
07/31/96 350 - THIS IS A PELLET STOVE/ EARLY PM PLEASE. WAS SCHEDULED FO MACHINE AT MONROE RESIDENCE TO LET US KNOW IF THEY WOULDN'T BE HOME IN AFTERNOON. AJB FILLED OUT FORM AND TURNED IN FINAL
|
MEC96-01636
| INSP - Final | 7/31/1996 | 7/31/1996 | 7/31/1996 12:00:00 AM | P | FAIL |
|
|
07/31/96 350 - NO FINAL CORRECTIONS ON RANGE HOOD
|
MEC96-01636
| INSP - Final | 7/31/1996 | 7/31/1996 | 7/31/1996 12:00:00 AM | P | FAIL |
|
|
07/31/96 350 - NO FINAL CORRECTIONS ON RANGE HOOD
|
MEC96-02070
| INSP - Gas pressure test | 7/31/1996 | 7/31/1996 | 7/31/1996 12:00:00 AM | P | CANC |
|
|
07/31/96 350 - REINSPECTION done by #326
|
MEC96-02128
| INSP - Framing/ Rough-in | 7/31/1996 | 7/31/1996 | 7/31/1996 12:00:00 AM | P | PASS |
|
|
07/31/96 350 - WARDELL, 5TH FLOOR- OFF ELEVATOR TURN LEFT- THINKS IT IS DUCT OK SIGNED FINAL OCC. CARD
|
MEC96-02164
| INSP - Gas log/ Fireplace | 7/30/1996 | 7/31/1996 | 7/31/1996 12:00:00 AM | P | FAIL |
|
|
07/31/96 350 - CORRECTIONS NO FINAL
|
MEC96-02171
| INSP - Rough-in & Gas Pressure | 7/31/1996 | 7/31/1996 | 7/31/1996 12:00:00 AM | P | PASS |
|
|
07/31/96 350 - R/I OK P/T OK #28295
|
MEC96-02172
| INSP - Rough-in & Gas Pressure | 7/31/1996 | 7/31/1996 | 7/31/1996 12:00:00 AM | P | PASS |
|
|
07/31/96 350 - R/I OK P/T OK#28299
|
BLD96-01001
| INSP - Framing/Rough-in | 7/30/1996 | 7/31/1996 | 7/31/1996 12:00:00 AM | P | FAIL |
|
|
07/31/96 350 - NEED IMFORMATION ON ELECT. BOXES IN 1HR. WALL ALSO METAL AT FLOOR WALL OF 1HR WALL
|
BLD96-01002
| INSP - Framing/Rough-in | 7/30/1996 | 7/31/1996 | 7/31/1996 12:00:00 AM | P | FAIL |
|
|
07/31/96 350 - CORRECTIONS ON 1HR WALLS
|
BLD96-01765
| INSP - Footings | 7/31/1996 | 7/31/1996 | 7/31/1996 12:00:00 AM | P | PASS |
|
|
07/31/96 350 - ALL SET BACKS OK EXACTLY 20' IN FRONT
|