Inspections for the day of: Tuesday, July 31, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-02451 Groundwork7/30/20017/31/20017/31/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/30/2001 at 13:26:03. Contact: ###-####. shop floor drain still needs trench drain 7/31/2001 9:05:55 AM
PLM01-02550 Water and/or Sewer7/30/20017/31/20017/31/2001 12:00:00 AMAPASS
call first ###-####
PLM01-01236 Plumbing Rough-in7/30/20017/31/20017/31/2001 12:00:00 AMAPART
Scheduled by Inspector: 330 On 7/30/2001 5:03:36 PM walk thru complete, will check hanger spacing, pressure fittings in waste system, procede twards test 7/31/2001 11:00:00 AM
PLM01-02516 Water and/or Sewer7/31/20017/31/20017/31/2001 12:00:00 AMAPASS
Added by Inspector: 330 On 7/31/2001 11:36:35 AM s/w final ok
PLM01-02458 Water and/or Sewer7/31/20017/31/20017/31/2001 12:00:00 AMPPASS
###-#### the work was limited to connection to new sewer main in the alley, inspected by public works 7/31/2001 2:10:24 PM
PLM01-02544 Groundwork7/31/20017/31/20017/31/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 07/31/2001 at 09:21:46. Contact: ###-####. building drain 7/31/2001 3:12:03 PM
PLM01-01874 Roof Drains7/31/20017/31/20017/31/2001 12:00:00 AMPCANC
Tyler ###-####
PLM01-02104 Plumbing Rough-in7/31/20017/31/20017/31/2001 12:00:00 AMPFAIL
###-#### 1 1/2" cross required at master lav, use brass/cpvc adpt. where threaded joints are required, 12" clearance required from recessed lights, glue traps, nail plates required, 7/31/2001 2:54:04 PM