PLM01-02451
| Groundwork | 7/30/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/30/2001 at 13:26:03. Contact: ###-####. shop floor drain still needs trench drain 7/31/2001 9:05:55 AM
|
PLM01-02550
| Water and/or Sewer | 7/30/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | A | PASS |
|
|
call first ###-####
|
PLM01-01236
| Plumbing Rough-in | 7/30/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 7/30/2001 5:03:36 PM walk thru complete, will check hanger spacing, pressure fittings in waste system, procede twards test 7/31/2001 11:00:00 AM
|
PLM01-02516
| Water and/or Sewer | 7/31/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 7/31/2001 11:36:35 AM s/w final ok
|
PLM01-02458
| Water and/or Sewer | 7/31/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | P | PASS |
|
|
###-#### the work was limited to connection to new sewer main in the alley, inspected by public works 7/31/2001 2:10:24 PM
|
PLM01-02544
| Groundwork | 7/31/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 09:21:46. Contact: ###-####. building drain 7/31/2001 3:12:03 PM
|
PLM01-01874
| Roof Drains | 7/31/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | P | CANC |
|
|
Tyler ###-####
|
PLM01-02104
| Plumbing Rough-in | 7/31/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | P | FAIL |
|
|
###-#### 1 1/2" cross required at master lav, use brass/cpvc adpt. where threaded joints are required, 12" clearance required from recessed lights, glue traps, nail plates required, 7/31/2001 2:54:04 PM
|