BLD01-01725
| BLD-Framing/Rough-in | 7/30/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | A | PASS |
|
|
shear Justin ###-####
|
BLD01-00025
| BLD-Final | 7/30/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | A | FAIL |
|
|
###-#### garage code 0912.needs plm and ele before a final. 7/31/2001 11:14:56 AM
|
BLD01-00685
| BLD-Final | 7/30/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | A | NH |
|
|
###-####
|
BLD01-00732
| BLD-Final | 7/30/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | A | FAIL |
|
|
###-####. The first stop work order placed in may is still posted, and it does not appear that any more work has been done. 7/31/2001 10:59:24 AM
|
BLD01-00265
| BLD-Framing/Rough-in | 7/31/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 00:54:34. Contact: ###-####. tall wall lower floor ok to sheetrock,noticed existing lights not supported in t-bar grid ceiling, contractor is going to wire support. 7/31/2001 10:11:22 AM
|
BLD01-01409
| BLD-Framing/Rough-in | 7/31/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | P | PART |
|
|
###-#### ext. 204 Delbert Motz .ok to side. 7/31/2001 3:54:47 PM
|
BLD01-01538
| BLD-Framing/Rough-in | 7/31/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | P | PART |
|
|
###-#### call first to meet. ok to complete all interior shear walls etc,need ok for 3/4" substitution of 1" bolts for ledgers,cont will provide ok from engineer.also stairs not yet constructed. 7/31/2001 3:54:29 PM
|
BLD01-01831
| BLD-Final | 7/31/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | P | PART |
|
|
ken 1-###-#### doug ###-#### owner. ok for perm oc pending electrical inspection sighn-off which is schedualed for this afternoon. 7/31/2001 2:29:45 PM
|
BLD99-02525
| BLD-Final | 7/31/2001 | 7/31/2001 | 7/31/2001 12:00:00 AM | P | FAIL |
|
|
bill ###-#### fn occ . garage ceiling needs repair over furnace. 7/31/2001 1:19:18 PM
|
BLD01-01466
| BLD-Footing | 7/30/2001 | 7/31/2001 | 3/30/2000 12:00:00 AM | A | PASS |
|
|
Lace ###-####
|