BLD03-01028
| BLD-Framing/Rough-in | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 8:40:09 AM. Contact: ###-####.Went over requirements with framer and posted c/n. 7/31/2003 6:38:45 PM
|
BLD03-01550
| BLD-Conference | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | A | PART |
|
|
IDAHO VIRTUAL ACADEMY; Phone #: ###-#### Internet Inspection Request from: Susie Seltzer. Sign up appears ok. 7/31/2003 11:34:51 AM
|
BLD03-01366
| BLD-Conference | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | A | PART |
|
|
PAD THAI HOUSE SIGN; Phone #: ###-#### Internet Inspection Request from: Susie Seltzer
|
BLD02-01612
| BLD-Final | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 3:01:02 PM. . needs some bolts in floor plates. 7/31/2003 1:53:56 PM
|
BLD02-01071
| BLD-Framing/Rough-in | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | A | CANC |
|
|
out of time 7/31/2003 6:55:16 PM
|
BLD02-01060
| BLD-Framing/Rough-in | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | A | CANC |
|
|
out of time 7/31/2003 6:55:11 PM
|
BLD02-01061
| BLD-Framing/Rough-in | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | A | CANC |
|
|
out of time 7/31/2003 6:55:05 PM
|
BLD02-01064
| BLD-Framing/Rough-in | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | P | CANC |
|
|
out of time 7/31/2003 6:55:22 PM
|
BLD02-02716
| BLD-Framing/Rough-in | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | P | CANC |
|
|
out of time. 7/31/2003 6:55:28 PM
|
BLD03-01071
| BLD-Framing/Rough-in | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 4:51:53 PM. Contact: ###-####.Out of time. 7/31/2003 6:56:08 PM
|
BLD03-00986
| BLD-Footing | 7/31/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | P | PART |
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Subject to special inspection.. 7/31/2003 1:56:11 PM
|
BLD03-01472
| BLD-Foundation | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | P | FAIL |
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. bar is not 2 in from inside face of wall, I spoke with engineer and if a vertical bar would be added at everyothr bar then center spacing of bar would be acceptable. i posted c/nwith plan and left message with contractor. 7/31/2003 6:41:38 PM
|