BLD03-01020
| FIRE-Final Inspection | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | A | PART |
|
|
Fire alarm and fire life safety given a temporary occupancy per Dave Miller until the main control vavle has been supervised by the fire alarm system. This will require city approved drawings. Contractor still needs to provide the annual inspection report so any other major issues can be addressed 7/31/2003 9:51:07 AM
|
BLD03-00273
| FIRE-Final Inspection | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | A | FAIL |
|
|
Remove thumbturn from the main exit, provide ADA compliant door hardware on the 7/31/2003 12:43:44 PM
|
FIR03-00336
| INSP-Sprinkler Rough-in/Hydro | 7/31/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | A | FAIL |
|
|
Provide a high temp. sprinkler pendant in the hood, provide retainign straps where shown on plans, provide hangers where shown on plans, provide intermediate temp head in the mens restroom, provide dry pendant in cooler. I told the contractor that it was ok to install ceiling tile but a ladder and a person would be required to be present at the final inspection to remove ceiling tile to verify completion of the above items. 7/31/2003 10:45:29 AM
|
FIR03-00233
| INSP-Final Inspection | 7/31/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | A | PART |
|
|
Fire alarm and fire life safety given a temporary occupancy per Dave Miller until the main control vavle has been supervised by the fire alarm system. This will require city approved drawings. Contractor still needs to provide the annual inspection report so any other major issues can be addressed
|
BLD03-00273
| FIRE-Final Inspection | 7/31/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | P | FAIL |
|
|
Remove thumbturn from the main exit, provide ADA compliant door hardware on the pocket doors, provide "Door to remain unlocked" sticker at the main exit, provide suite numbers, provide automatic shutdown on the hvac system per IMC 606, provide remote alarm/trouble indicators per IMC 606.4.1 #2 and repair the emergency light
|
FIR03-00251
| INSP-Sprinkler Rough-in/Hydro | 7/31/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | P | PASS |
|
|
aabove ground hydro test and final inspection is ok 7/31/2003 3:18:56 PM
|
FIR03-00324
| INSP-Final Inspection | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | P | FAIL |
|
|
could not perform test due to the apparent failure of the dialer module for the fire alarm pane. We did test standby battery requirements for the main facp and the power supply for the duct smoke detectors. The batteries are sized correctly 7/31/2003 12:54:04 PM
|
FIR03-00117
| INSP-Final Inspection | 7/30/2003 | 7/31/2003 | 7/31/2003 12:00:00 AM | P | FAIL |
|
|
There was no test orfice in the anti-freeze system piping of the post office so test could not be completed. The fire alarm system and the water motor gong in Handcock Fabrics did not operate 7/31/2003 4:00:26 PM
|