Inspections for the day of: Tuesday, July 31, 2007.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-01470 Final7/31/20077/31/20077/31/2007 3:39:30 PMPPASS
ELE07-01920 Final7/31/20077/31/20077/31/2007 3:23:47 PMPPART
kevin - apts 204-207; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
apts 204-207 ok
ELE07-02669 Permanent Service7/30/20077/31/20077/31/2007 2:51:30 PMPPASS
200amp service upgrade and wire new A/C unit. Any questions call Jimmy @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose
P/S O/H R Ok
ELE07-02669 Final7/31/20077/31/20077/31/2007 2:50:52 PMPPASS
200amp service upgrade and wire new A/C unit. Any questions call Jimmy @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose
ELE07-02587 Permanent Service7/31/20077/31/20077/31/2007 2:18:56 PMPPASS
This one is for Bill! Phone #: ###-#### Internet Inspection Request from: Steven Meredith
ELE07-02587 Final7/31/20077/31/20077/31/2007 2:18:44 PMPPASS
This one is for Bill! Phone #: ###-#### Internet Inspection Request from: Steven Meredith
ELE07-02044 Permanent Service7/31/20077/31/20077/31/2007 1:41:49 PMPFAIL
Scheduled by a contractor via Hello! on 7/31/2007 at 8:23:22 AM. Contact: ###-####.
raceway bonded with #6 should be #4.
grounding jumper in meter is connected with dissimmilar materials. install connector on GEC.
I talked to dave about determining the building extent and passed on that the general or electrical contractor has to go to plan review and get the info on ho this building is devided.
ELE07-02678 Conference7/30/20077/31/20077/31/2007 12:05:20 PMAPART
robert for hot tub Phone #: ###-#### Note: please call wants to meet with you
talked about service change
ELE07-02679 Temporary Service7/30/20077/31/20077/31/2007 11:14:51 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Paul Schepper
T/S U/G Ok
ELE07-02627 Temporary Service7/30/20077/31/20077/31/2007 10:45:22 AMAPASS
bernice Phone #: ###-####
T/S O/H Ok
ELE07-02062 Electrical Rough-In7/31/20077/31/20077/31/2007 10:20:38 AMAPART
Scheduled by a contractor via Hello! on 7/31/2007 at 6:20:53 AM. Contact: ###-####.
walls anop
ELE07-00530 Final7/30/20077/31/20077/31/2007 9:44:46 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Joe Thomas
ELE07-00165 Final7/31/20077/31/20077/31/2007 8:33:05 AMAPASS
Scheduled by a contractor via Hello! on 7/31/2007 at 5:31:58 AM. Contact: ###-####.
ELE07-02615 Final7/30/20077/31/20077/30/2007 4:25:45 PMAPART
AM as per Pat Lass Phone #: ###-#### Internet Inspection Request from: Miles Berry
ok to energize for 3 days at which time grounding and clearance problems shall be resolved
P/S U/G R Ok