Inspections for the day of: Thursday, July 31, 2008.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl Spivey
TitlePLM-INSPECTOR
Phone #794-9485
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM08-01823 Groundwork7/30/20087/31/20087/31/2008 4:14:02 PMAPART
Thanks! Phone #: ###-#### Internet Inspection Request from: Samuel DrakeGroundwork to ejector ok to cover...cannot tie vents into 1st floor fixtures vent below floor ..............ds
MIS08-00113 PLM-Conference7/30/20087/31/20087/31/2008 4:10:33 PMAPASS
per lee rice- un sanitary conditions--contact is tanish martinez at ###-####
Went to residence and did a walk thru with John the owner......The complaintant does have a bathroom but what happened was a hose bib broke and the owner did not fix it for a few days.......Water is back on now and fixtures are working...............ds
PLM08-01854 Groundwork7/31/20087/31/20087/31/2008 3:48:50 PMPPASS
Phone #: ###-####
PLM08-01056 Final7/31/20087/31/20087/31/2008 2:56:17 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Brandon Rohricht
PLM08-01856 Water and/or Sewer7/31/20087/31/20087/31/2008 2:39:59 PMPPASS
larry brooks
PLM08-01856 DOC - Permit Finaled7/31/20087/31/20087/31/2008 2:26:40 PMPPASS
PLM08-01839 Plumbing Rough-in7/30/20087/31/20087/31/2008 12:19:04 PMPPASS
James Phone #: ###-####
PLM08-01842 Groundwork7/30/20087/31/20087/31/2008 11:06:21 AMAPASS
Please call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
PLM07-02976 Plumbing Rough-in7/30/20087/31/20087/31/2008 10:58:42 AMANR
Brent Proper is the field contact. Partial Rough In for Level 3 & 4 Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
waste and vent only and had some problems with leaks and test holding......ds
PLM08-01736 Plumbing Rough-in7/30/20087/31/20087/31/2008 9:06:55 AMAPART
victor fox ###-####
rm 228 east wall 2 sinks good to cover......ds