Inspections for the day of: Thursday, July 31, 2008.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00162 Aging Inspection7/31/20087/31/20088/4/2008 2:40:28 PM PASS
ESC08-00596 Random Inspection7/28/20087/31/20088/1/2008 1:56:48 PMAPASS
ESC08-00225 General Inspection7/31/20087/31/20087/31/2008 4:26:47 PMPFAIL
Need to clean up all surfaces and figure out a better sediment bmp than the wattles on the hard surface. Will re-inspect on 8/1/08 to consult with the issues pertain with the project to the RP and the project super.
CAS
ESC08-00178 General Inspection7/31/20087/31/20087/31/2008 3:37:28 PMPPASS
ESC08-00400 Random Inspection7/31/20087/31/20087/31/2008 3:36:25 PMPPART
Need to still clean up sediment on hard surfaces next to the bridge. D.I. protect next to the Morrison Center building.
CAS
ESC08-00495 General Inspection7/31/20087/31/20087/31/2008 2:57:01 PMPPART
Need to move porter pottie off of the sidewalk(right-a-way). Left message with RP over the issue. Will re-inspect in week from now.
CAS
CAS
ESC07-00867 Site Final7/31/20087/31/20087/31/2008 2:42:20 PMPPASS
All work complete.
CAS
ESC07-00865 Site Final7/31/20087/31/20087/31/2008 2:42:03 PMPPASS
All work complete.
CAS
ESC07-00018 Site Final7/31/20087/31/20087/31/2008 2:41:46 PMPPASS
All work complete.
CAS
ESC06-01554 Site Final7/31/20087/31/20087/31/2008 2:41:08 PMPPASS
All work complete.
CAS
ESC05-00514 Site Final7/31/20087/31/20087/31/2008 2:40:53 PMPPASS
All work complete.
CAS
ESC05-00515 Site Final7/31/20087/31/20087/31/2008 2:40:33 PMPPASS
All work complete.
CAS
ESC05-00513 Site Final7/31/20087/31/20087/31/2008 2:40:05 PMPPASS
All work complete.
CAS
ESC06-00508 Site Final7/31/20087/31/20087/31/2008 2:39:02 PMPPASS
All work complete.
CAS
ESC06-00156 Site Final7/31/20087/31/20087/31/2008 2:33:55 PMPPASS
All disturbed soil is stabilized.
CAS
ESC07-01200 Site Final7/31/20087/31/20087/31/2008 2:09:44 PMPPASS
Lot stabilized. Minor trash debris on the side of the lot. Will be picked up in the next week.
CAS
ESC08-00202 Tracking Control7/31/20087/31/20087/31/2008 1:04:58 PMAFAIL
Need to clean up tracking off of Vinnel onto Overland Rd. Spoke with GC over the issue.
CAS
ESC04-01006 Site Final7/31/20087/31/20087/31/2008 10:51:06 AMPPASS
ESC03-00795 Site Final7/31/20087/31/20087/31/2008 10:50:30 AMPPASS
ESC05-00026 Site Final7/31/20087/31/20087/31/2008 10:13:14 AMPDONE
No activity. BLD has expired. New ESC will need to be created when if it starts up again.
CAS
ESC06-01362 Site Final7/31/20087/31/20087/31/2008 10:11:13 AMPPASS
site stabilized
CAS
ESC08-00115 BMP Violation7/29/20087/31/20087/31/2008 9:45:11 AMADEFR
Moved to 8/1/08
CAS
ESC08-00578 General Inspection7/31/20087/31/20087/31/2008 9:43:48 AMAPASS
Site is kept clean. Looking very good.
CAS
ESC07-00071 Tracking Control7/28/20087/31/20087/31/2008 9:05:35 AMAPASS
Entrance installed correctly. And tracking is cleaned up.
CAS