ESC09-00388
| General Inspection | 7/31/2009 | 7/31/2009 | 7/31/2009 3:55:33 PM | P | PASS |
|
|
looked ok
|
ESC09-00240
| General Inspection | 7/31/2009 | 7/31/2009 | 7/31/2009 3:54:07 PM | P | PASS |
|
|
looked ok
|
ELE09-01170
| Electrical Rough-In | 7/31/2009 | 7/31/2009 | 7/31/2009 3:44:55 PM | P | PASS |
|
|
Nedd ceiling inspection - Bud Gibson Phone #: ###-#### Internet Inspection Request from: Kevin Perez ok to cover ceiling only, no esc this project
|
ELE08-03233
| Final | 7/31/2009 | 7/31/2009 | 7/31/2009 3:20:16 PM | A | PART |
|
|
This inspection is for TCO. Rey is the contact. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw no tco given, looked at ceilings dry storage area, need to install drip shield, affix all panel schedules and panel voltage signs, secure phone sealtite at north of area, tighten boxes at sprinkler riser area, met 412 to inspect with, no esc this project, told that customer can begin moving in but needs to concur with structural
|
ELE09-00863
| Final | 7/30/2009 | 7/31/2009 | 7/31/2009 2:44:54 PM | P | PASS |
|
|
Please call and let me know aprox. time of inspection so I can make sure someone is home. Thank you, Steve Ruter Phone #: ###-#### Internet Inspection Request from: Steve Ruter ok to final, no esc this project
|
ELE09-01403
| Permanent Service | 7/31/2009 | 7/31/2009 | 7/31/2009 1:38:10 PM | P | PASS |
|
|
mitch Phone #: ###-#### p/s o/h rec ok, no esc this project
|
ELE09-01391
| Final | 7/31/2009 | 7/31/2009 | 7/31/2009 1:26:05 PM | P | PASS |
|
|
PAUL EARLY AFTERNOON. Phone #: ###-#### Internet Inspection Request from: Sean DeLacy p/s o/h rec ok, no esc this project
|
ELE09-00694
| Electrical Rough-In | 7/31/2009 | 7/31/2009 | 7/31/2009 12:38:46 PM | A | PART |
|
|
This inspection is for over head ceiling. Rey in the contact. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok to cover ceilings in office area, no esc this project, went with 412, ceilings are changing to not being plenum depnding on structural concurrence
|
ELE09-00830
| Electrical Rough-In | 7/31/2009 | 7/31/2009 | 7/31/2009 12:02:48 PM | A | PASS |
|
|
This inspection is for overhead. Contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok to cover ceiling only, no esc this project, met with 412
|
ELE09-01387
| Electrical Rough-In | 7/30/2009 | 7/31/2009 | 7/31/2009 9:49:29 AM | A | PASS |
|
|
harvey Phone #: ###-#### walls only ok to cover, no esc this project
|
ELE09-01373
| Electrical Rough-In | 7/31/2009 | 7/31/2009 | 7/31/2009 7:57:31 AM | A | PASS |
|
|
the walls are ready for cover Andy is on site working on either 305 or 460 call at ###-#### if you get lost thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig walls only ok to cover, no esc this project
|
ELE08-03233
| Temporary Service | 7/31/2009 | 7/31/2009 | 7/31/2009 7:11:19 AM | A | CANC |
|
|
This inspection will for TCO. Contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw Inspection cancelled from web by: Laura Longshaw
|