Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00388 General Inspection7/31/20097/31/20097/31/2009 3:55:33 PMPPASS
looked ok
ESC09-00240 General Inspection7/31/20097/31/20097/31/2009 3:54:07 PMPPASS
looked ok
ELE09-01170 Electrical Rough-In7/31/20097/31/20097/31/2009 3:44:55 PMPPASS
Nedd ceiling inspection - Bud Gibson Phone #: ###-#### Internet Inspection Request from: Kevin Perez ok to cover ceiling only, no esc this project
ELE08-03233 Final7/31/20097/31/20097/31/2009 3:20:16 PMAPART
This inspection is for TCO. Rey is the contact. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw no tco given, looked at ceilings dry storage area, need to install drip shield, affix all panel schedules and panel voltage signs, secure phone sealtite at north of area, tighten boxes at sprinkler riser area, met 412 to inspect with, no esc this project, told that customer can begin moving in but needs to concur with structural
ELE09-00863 Final7/30/20097/31/20097/31/2009 2:44:54 PMPPASS
Please call and let me know aprox. time of inspection so I can make sure someone is home. Thank you, Steve Ruter Phone #: ###-#### Internet Inspection Request from: Steve Ruter ok to final, no esc this project
ELE09-01403 Permanent Service7/31/20097/31/20097/31/2009 1:38:10 PMPPASS
mitch Phone #: ###-#### p/s o/h rec ok, no esc this project
ELE09-01391 Final7/31/20097/31/20097/31/2009 1:26:05 PMPPASS
PAUL EARLY AFTERNOON. Phone #: ###-#### Internet Inspection Request from: Sean DeLacy p/s o/h rec ok, no esc this project
ELE09-00694 Electrical Rough-In7/31/20097/31/20097/31/2009 12:38:46 PMAPART
This inspection is for over head ceiling. Rey in the contact. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok to cover ceilings in office area, no esc this project, went with 412, ceilings are changing to not being plenum depnding on structural concurrence
ELE09-00830 Electrical Rough-In7/31/20097/31/20097/31/2009 12:02:48 PMAPASS
This inspection is for overhead. Contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok to cover ceiling only, no esc this project, met with 412
ELE09-01387 Electrical Rough-In7/30/20097/31/20097/31/2009 9:49:29 AMAPASS
harvey Phone #: ###-#### walls only ok to cover, no esc this project
ELE09-01373 Electrical Rough-In7/31/20097/31/20097/31/2009 7:57:31 AMAPASS
the walls are ready for cover Andy is on site working on either 305 or 460 call at ###-#### if you get lost thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig walls only ok to cover, no esc this project
ELE08-03233 Temporary Service7/31/20097/31/20097/31/2009 7:11:19 AMACANC
This inspection will for TCO. Contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw Inspection cancelled from web by: Laura Longshaw