PLM09-01150
| Final | 7/31/2009 | 7/31/2009 | 7/31/2009 4:23:14 PM | P | PART |
|
|
please call mile before going at ###-#### Phone #: ###-#### Internet Inspection Request from: Kelea Dunne-partial waterline.
|
ESC07-00365
| Site Final | 7/31/2009 | 7/31/2009 | 7/31/2009 4:12:39 PM | P | PASS |
|
|
|
PLM09-01216
| Water and/or Sewer | 7/31/2009 | 7/31/2009 | 7/31/2009 4:09:05 PM | P | NR |
|
|
|
PLM09-01214
| Plumbing Rough-in | 7/31/2009 | 7/31/2009 | 7/31/2009 3:46:01 PM | P | FAIL |
|
|
dwv test failed, missing nailplates.
|
ESC09-00403
| Random Inspection | 7/31/2009 | 7/31/2009 | 7/31/2009 3:45:27 PM | P | FAIL |
|
|
Left verbal correction with rp to put all trash in a container or remove from site by 8-03-09 pm. Will reinspect 8-04-09 am.
|
PLM09-00083
| Final | 7/31/2009 | 7/31/2009 | 7/31/2009 3:11:59 PM | P | PASS |
|
|
randy - please call for access Phone #: ###-####
|
PLM09-01214
| Plumbing Rough-in | 7/31/2009 | 7/31/2009 | 7/31/2009 3:11:16 PM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Erin Whiting
|
ESC08-00750
| General Inspection | 7/31/2009 | 7/31/2009 | 7/31/2009 3:09:18 PM | P | FAIL |
|
|
Left verbal correction on voice mail of rp to post esc sign & clean dirt & debris off all hard surfaces by 8-03-09 pm. Will reinspect on 8-04-09 am.
|
PLM09-00760
| Groundwork | 7/31/2009 | 7/31/2009 | 7/31/2009 2:35:00 PM | P | PART |
|
|
Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-fuel interceptors have been repiped, still need 24 hr test on interceptor on south side.
|
PLM09-00760
| Final | 7/30/2009 | 7/31/2009 | 7/31/2009 2:32:48 PM | A | CANC |
|
|
This is for a partial final in the main office and the dry goods areas. Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-MAIN OFFICE -WRONG PERMIT
|
PLM09-00248
| Final | 7/31/2009 | 7/31/2009 | 7/31/2009 2:30:28 PM | P | PART |
|
|
This is for a partial final in the main office and the dry goods areas. Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-MAIN OFFICE -4 sinks & 1 waterheater left. temp ok.
|
PLM09-00859
| Plumbing Rough-in | 7/30/2009 | 7/31/2009 | 7/31/2009 1:09:32 PM | A | PASS |
|
|
Job will be ready on test at 10:30 am. Thanks, Boe Phone #: ###-#### Internet Inspection Request from: Boe Jares
|
PLM09-01207
| Plumbing Rough-in | 7/30/2009 | 7/31/2009 | 7/31/2009 11:18:14 AM | A | PASS |
|
|
Mait Phone #: ###-####
|
PLM09-01086
| Final | 7/30/2009 | 7/31/2009 | 7/31/2009 11:04:41 AM | A | PASS |
|
|
Call if entry needed Phone #: ###-#### Internet Inspection Request from: Josh Johnson
|
ESC08-00491
| BMP Violation | 7/28/2009 | 7/31/2009 | 7/31/2009 10:42:26 AM | A | PART |
|
|
DI boxes have been cleaned, sweaping going on.
|
ESC08-01050
| Random Inspection | 7/30/2009 | 7/31/2009 | 7/31/2009 9:13:52 AM | A | PASS |
|
|
site looks good.
|
PLM09-01216
| Water and/or Sewer | 7/30/2009 | 7/31/2009 | 7/31/2009 9:11:37 AM | A | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Cody Echevarria-need to test waterline.
|