Inspections for the day of: Friday, July 31, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDoug A Poedy
TitleELE-INSPECTOR
Phone #447-7209
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE09-00783 Electrical Rough-In7/30/20097/31/20097/31/2009 4:09:44 PMPPART
danny - please call 1/2 hr prior Phone #: ###-####. ok to cover part east walls.
ELE09-01331 Final7/31/20097/31/20097/31/2009 4:07:43 PMPPASS
robin Phone #: ###-####. Ok final.
ELE09-00813 Final7/31/20097/31/20097/31/2009 2:58:31 PMPPASS
Ok final
ELE09-01025 Electrical Rough-In7/31/20097/31/20097/31/2009 2:10:01 PMPFAIL
sam - please call 1/2 hr prior Phone #: ###-####.NEC 334.30 Securing and supporting. NEC 300.4 Protection against physical damage.NEC 300.15 Boxes, Conduit bodies, or fittings where required.
ELE09-00867 Final7/31/20097/31/20097/31/2009 1:12:40 PMPPASS
Scheduled by a contractor via Hello! on 7/31/2009 at 9:34:15 AM. Contact: ###-####. Ok final.
ELE09-00867 DOC - Permit Finaled7/31/20097/31/20097/31/2009 1:12:21 PMPPASS
ELE09-01223 Final7/30/20097/31/20097/31/2009 12:22:06 PMANH
lock box code MJS Phone #: ###-#### Internet Inspection Request from: Therrin Robertson. No one home. Left message for Therrin.
ELE09-01283 Final7/30/20097/31/20097/31/2009 12:07:01 PMAPASS
Phone #: ###-#### Internet Inspection Request from: Gary Foreman. Ok final.
ELE09-01283 DOC - Permit Finaled7/31/20097/31/20097/31/2009 12:06:40 PMPPASS
ELE09-00813 Final7/30/20097/31/20097/31/2009 9:52:59 AMANH
Steve- call for access for gate Phone #: ###-####.Called Steve left message.
ELE09-01331 Final7/29/20097/31/20097/31/2009 9:51:06 AMANH
Dan Phone #: ###-####. Left note on door, and called Dan.
ELE09-01028 Electrical Rough-In7/30/20097/31/20097/31/2009 9:21:12 AMAPASS
Scheduled by a contractor via Hello! on 7/30/2009 at 2:31:18 PM. Contact: ###-####. Ok to cover.
ELE09-01279 Permanent Service7/30/20097/31/20097/30/2009 3:56:48 PMAPASS
P/S O/H connect ok.