Inspections for the day of: Tuesday, July 31, 2012.
Number of inspections: 11
Percentage of inspections complete: 91 %
Percentage of inspections not complete: 9 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00368 INSP-Final Inspection7/23/20127/24/2012 A 
call me when you get there & I will let you in. 6am Phone #: ###-#### >> Inspection requested via web by Rick Groom
BLD11-02317 FIRE-Conference7/31/20127/31/20127/31/2012 6:41:29 PMPPART
Fire life safety walkthrough for the 1st floor lobby/front counter and employee work area remodel finishes to date. Noted missing EM lights at exit discharge landings- see fire code review note #8 related. Upright sprinkler protection to be provided where drop ceilings are missing within occupied areas at the lobby. Physical barriers to be maintained between areas under construction and those accessible to building staff and the public.
FIR12-00033 INSP-Alarm Testing7/30/20127/31/20127/31/2012 6:17:59 PMAPART
Finished partial inspection for fire alarm work completed to date at the first floor lobby/front counter area including employee offices. Re-inspection for previous correction items include; MP station relocated from behind ADA partition, SD relocated from HVAC diffusers at three locations, access panels provided at dampers per IMC. Notification appliance at the foothills conference room okayed based upon adjacent coverage in the lobby through the glass partition doors. Both main lobby dampers east side to remain closed due to missing drop ceilings and area detection between phases as discussed. Audible sync issues between buildings 1 and 2 remain unchanged. 2nd floor sync issues building one to be addressed under future upgrade permits- ref. activity note 7/6. Items tested today include SD's for recall functions at both 1st floor elevators, all new SD installed to date, 3 MP's, operation at three dampers south side hall. Need to add one MP at the employee work area exit west side vestibule 102. SD at the west elevator to be relocated to the deck while drop ceilings are removed.
FIR12-00246 INSP-Sprinkler Rough-in7/31/20127/31/20127/31/2012 5:52:09 PMPPART
Overhead rough-in at the kitchen area as marked and dated on stamped plans okayed.
FIR11-00689 INSP-Sprinkler Rough-in7/30/20127/31/20127/31/2012 5:03:25 PMAPART
Verified added coverage at the stair tower lower landings, coverage adjustments to the east wall sub fab are finished.
BLD12-01079 FIRE-Final Inspection7/31/20127/31/20127/31/2012 1:43:34 PMPPASS
Fire life safety final approved.
BLD12-01652 FIRE-Final Inspection7/31/20127/31/20127/31/2012 1:41:19 PMPPASS
Fire life safety completed satisfactory.
FIR12-00344 INSP-Final Inspection7/31/20127/31/20127/31/2012 1:38:23 PMPPASS
Final walkthrough passed. Fire sprinkler permit finaled.
FIR12-00368 INSP-Final Inspection7/30/20127/31/20127/31/2012 1:35:49 PMAPASS
Inspection passed. Fire alarm permit finaled.
FIR12-00356 INSP-Final Inspection7/30/20127/31/20127/31/2012 1:31:11 PMAPASS
Fire alarm work passed field inspection. Permit finaled.
FIR12-00332 INSP-Supply line flush7/30/20127/31/20127/31/2012 1:28:20 PMAPART
UG fire supply line flush completed.