FIR12-00390
| INSP-Sprinkler Rough-in | 7/31/2012 | 7/31/2012 | 7/31/2012 3:47:10 PM | P | PASS |
|
|
The sprinkler line in the soffit can be covered.
|
FIR12-00116
| INSP-Final Inspection | 7/31/2012 | 7/31/2012 | 7/31/2012 3:46:26 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00347
| INSP-Supply line flush | 7/31/2012 | 7/31/2012 | 7/31/2012 3:45:57 PM | A | PART |
|
|
Todays inspection was actually a cover inspection for the underground supply and a overhead rough-in. The underground supply can be buried and for the most part the rough-in is passed. Except for one head as marked on the plans is overspaced and plans need to be resubmitted addressing the additional fitting in the piping to the remote area. The new fittings appear to be due to pipe routing changes.
|
BLD12-00345
| FIRE-Final Inspection | 7/30/2012 | 7/31/2012 | 7/31/2012 3:41:54 PM | A | FAIL |
|
|
Repair emergency lights.
|
FIR12-00151
| INSP-Final Inspection | 7/27/2012 | 7/31/2012 | 7/31/2012 3:40:19 PM | A | PASS |
|
|
Permit finaled
|
FIR12-00223
| INSP-Final Inspection | 7/30/2012 | 7/31/2012 | 7/31/2012 8:26:42 AM | A | CANC |
|
|
Canceled per Jeff Phone #: ###-####. Fire alarm contractor is not there.
|