BLD13-00415
| FIRE-Final Inspection | 7/31/2013 | 7/31/2013 | 7/31/2013 5:48:52 PM | P | FAIL |
|
|
Fire extinguisher is overdue annual certification, provide approved door hardware at the new storage room.
|
FIR13-00133
| INSP-Sprinkler Rough-in/Hydro | 7/30/2013 | 7/31/2013 | 7/31/2013 5:47:08 PM | A | PART |
|
|
OH hydrostatic test completed for the 16th and 17th floors.
|
FIR13-00133
| INSP-Sprinkler Rough-in | 7/30/2013 | 7/31/2013 | 7/31/2013 5:45:49 PM | A | PART |
|
|
Preliminary rough-in inspection of the penthouse system only. Some areas incompleted or not yet constructed including the electrical room, top of stairway, south end duct, sheetrock at walls. Discussed possible obstructions.
|
FIR12-00634
| INSP-Sprinkler Rough-in/Hydro | 7/30/2013 | 7/31/2013 | 7/31/2013 5:39:18 PM | A | PART |
|
|
OH hydrostatic test of both standpipes completed satisfactory.
|
FIR13-00237
| INSP-Final Inspection | 7/31/2013 | 7/31/2013 | 7/31/2013 5:36:30 PM | A | PASS |
|
|
Fire alarm testing completed, inspection passed. Permit finaled.
|