FIR14-00373
| INSP-Sprinkler Rough-in | 7/30/2014 | 7/31/2014 | 7/31/2014 5:08:46 PM | P | PART |
|
|
Noted two missing hangers at armovers, one pendent head in need of alignment, obstruction at one head due to an exit sign. Remainder of overhead work approved for cover. Painted escutcheon at the west elevator lobby sheetrock ceiling to be replaced.
|
BLD14-02077
| FIRE-Final Inspection | 7/30/2014 | 7/31/2014 | 7/31/2014 5:04:33 PM | P | FAIL |
|
|
Items needed prior to final include; provide current certification for fire extinguishers, cover open electrical junction boxes, install remainder of storage racks for verification of required isle width per plan review notes.
|
FIR14-00219
| INSP-Sprinkler Rough-in/Hydro | 7/30/2014 | 7/31/2014 | 7/31/2014 12:25:15 PM | A | NR |
|
|
As early as possible Phone #: 2089411846 >> Inspection requested via mobile web by Brian
|
BLD14-00700
| FIRE-Final Inspection | 7/30/2014 | 7/31/2014 | 7/31/2014 12:24:53 PM | A | PASS |
|
|
Fire life safety finaled. Door hardware at the conference room to be revised prior to structural final as discussed 7/30.
|
BLD14-00297
| FIRE-Final Inspection | 7/30/2014 | 7/31/2014 | 7/31/2014 12:21:02 PM | A | PASS |
|
|
Life safety inspection passed, C/N items finished.
|