GCM14-00188
| GCM-Rough-in | 7/30/2014 | 7/31/2014 | 7/31/2014 10:57:15 AM | A | PASS |
|
|
###-#### no inpsection on roof at this time
|
MEC14-03223
| Pressure Test | 7/30/2014 | 7/31/2014 | 7/31/2014 10:29:59 AM | A | PASS |
|
|
Please call Heather ###-#### or Brandon ###-#### prior to arrival. Phone #: ###-#### >> Inspection requested via web by James Staley 20 # test gas line from garage to range
|
MEC14-01810
| Pressure Test | 7/30/2014 | 7/31/2014 | 7/31/2014 10:14:03 AM | A | CANC |
|
|
Steve Bunch ###-#### rescheduled for dixie afternoon
|
MEC14-01274
| Final | 7/30/2014 | 7/31/2014 | 7/31/2014 9:27:36 AM | A | PASS |
|
|
Steve Bunch ###-####
|
MEC14-01126
| Final | 7/31/2014 | 7/31/2014 | 7/31/2014 9:27:24 AM | A | PASS |
|
|
|
MEC14-03209
| Pressure Test | 7/30/2014 | 7/31/2014 | 7/31/2014 9:15:25 AM | A | FAIL |
|
|
Underground piping on test Phone #: ###-#### >> Inspection requested via web by sean rocke expose gas line for inspections if the gas line is plastic, need 18 gage wire along the gas line. test guage shall not be 2 times larger than the required test pressure.
|