BLD14-01345
| BLD-Final | 7/30/2014 | 7/31/2014 | 7/31/2014 3:48:23 PM | P | FAIL |
|
|
Needs to install smoke detetors in the bedrooms and smoke/corbon outside of the bedrooms.
|
BLD14-00204
| BLD-Wall Bracing | 7/31/2014 | 7/31/2014 | 7/31/2014 2:56:45 PM | P | PASS |
|
|
Richard Phone #: ###-#### All exterior shear walls ok
|
BLD14-00203
| BLD-Wall Bracing | 7/31/2014 | 7/31/2014 | 7/31/2014 2:55:45 PM | P | PASS |
|
|
Richard Phone #: ###-#### All exterior shear walls ok
|
BLD14-01509
| BLD-Footing | 7/30/2014 | 7/31/2014 | 7/31/2014 2:08:16 PM | P | CANC |
|
|
John Phone #: ###-####
|
BLD14-01510
| BLD-Footing | 7/30/2014 | 7/31/2014 | 7/31/2014 2:07:59 PM | P | CANC |
|
|
John Phone #: ###-####
|
BLD13-03476
| BLD-Energy code compliance | 7/31/2014 | 7/31/2014 | 7/31/2014 1:58:36 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
|
BLD13-02645
| BLD-Footing | 7/31/2014 | 7/31/2014 | 7/31/2014 1:51:36 PM | P | PASS |
|
|
Wes-pour time 2:00 Phone #: ###-####
|
BLD14-00819
| BLD-Wall Bracing | 7/30/2014 | 7/31/2014 | 7/31/2014 1:11:56 PM | A | PASS |
|
|
Dave-in stairwell Phone #: ###-#### 1st floor interior stair way shear walls only
|
BLD14-01729
| BLD-Footing | 7/30/2014 | 7/31/2014 | 7/31/2014 12:25:47 PM | A | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD14-01493
| BLD-Framing/Rough-in | 7/31/2014 | 7/31/2014 | 7/31/2014 10:51:32 AM | P | CANC |
|
|
Framing inspection so we can insulate please. As late in afternoon as possible. Thank you Phone #: ###-#### >> Inspection requested via web by Joshua Edwards Inspection cancelled from web by: Joshua Edwards
|
BLD14-00772
| BLD-Foundation | 7/30/2014 | 7/31/2014 | 7/31/2014 10:37:22 AM | A | CANC |
|
|
Concrete is at 11:00 we are pouring shear walls, 10+ yds. Thanks. Phone #: ###-#### Inspection requested via web by Tony Inserra
|
BLD14-01391
| BLD-Footing | 7/30/2014 | 7/31/2014 | 7/31/2014 9:44:43 AM | A | PASS |
|
|
Doug Phone #: ###-####
|