PLM17-00244
| Plumbing Rough-in | 7/31/2017 | 7/31/2017 | 7/31/2017 3:04:05 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by JASON MEANS-Test on Tempered water East/West mechanical 27 K & 51.2 pass.
|
PLM17-02602
| Plumbing Rough-in | 7/28/2017 | 7/31/2017 | 7/31/2017 2:31:56 PM | P | FAIL |
|
|
JOB # 19236 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes-DWV test fail
|
PLM17-02622
| Final | 7/28/2017 | 7/31/2017 | 7/31/2017 2:17:05 PM | P | PASS |
|
|
If there are any questions please contact Jerry P. at ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM17-02623
| Plumbing Rough-in | 7/31/2017 | 7/31/2017 | 7/31/2017 1:58:45 PM | P | PASS |
|
|
|
PLM17-02623
| Groundwork | 7/28/2017 | 7/31/2017 | 7/31/2017 1:58:22 PM | P | CANC |
|
|
Go through the back gate Key is in the tool box on the back porch. Phone #: ###-#### Inspection requested via web by Steve Spence
|
PLM17-00760
| Plumbing Rough-in | 7/31/2017 | 7/31/2017 | 7/31/2017 1:20:50 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Stephenson
|
PLM17-01510
| Final | 7/31/2017 | 7/31/2017 | 7/31/2017 12:37:53 PM | P | PASS |
|
|
|
PLM17-02831
| Final | 7/28/2017 | 7/31/2017 | 7/31/2017 11:25:48 AM | A | PASS |
|
|
Please call the homeowner, Jennifer for access at ###-#### thank you. Phone #: ###-#### Inspection requested via web by Ben Welgan
|
PLM17-02256
| Final | 7/28/2017 | 7/31/2017 | 7/31/2017 10:55:24 AM | A | PASS |
|
|
Please call homeowner, Jan Dowell, at ###-#### to verify that we installed carbon monoxide detectors. Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
PLM17-01288
| Final | 7/28/2017 | 7/31/2017 | 7/31/2017 10:11:26 AM | A | PASS |
|
|
PLEASE CALL ZACH 1/2 HOUR BEFORE ARRIVAL. ###-#### IF UNABLE TO REACH ZACH, PLEASE CALL KELLI MORGAN AT ###-#### FOR GARAGE CODE Phone #: ###-#### Inspection requested via web by JEREMY LINK
|
PLM17-02815
| Final | 7/27/2017 | 7/31/2017 | 7/31/2017 9:46:55 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone
|
PLM17-02815
| DOC - Permit Finaled | 7/31/2017 | 7/31/2017 | 7/31/2017 9:46:46 AM | P | PASS |
|
|
|
PLM17-01510
| Final | 7/28/2017 | 7/31/2017 | 7/31/2017 8:48:25 AM | A | NR |
|
|
Garage code is 0304 Phone #: ###-#### Inspection requested via web by Steve Spence
|
PLM17-02776
| Other | 7/25/2017 | 7/31/2017 | 7/31/2017 8:47:52 AM | A | DONE |
|
|
Onsite Pre-Construction Meeting scheduled with Eric Stole at 8:00 a.m. Phone #: ###-#### Inspection requested via web by Taylor Landa-Pre-construction meeting. Per Rick with public works the truck wash building will have a fuel intercepor with a valve before that when not washing trucks will divert rain water to the old septic system system and not alow storm water into the new pressure sewer system.
|