Inspections for the day of: Monday, July 31, 2017.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01187 BMP Violation7/28/20177/31/20178/7/2017 8:56:23 AMPCANC
ESC16-01553 General Inspection7/31/20177/31/20178/4/2017 4:59:55 PM CANC
ESC16-00489 General Inspection7/28/20177/31/20178/4/2017 2:40:20 PMPPASS
ESC17-00395 General Inspection7/28/20177/31/20178/4/2017 9:35:10 AMACANC
ESC17-00040 General Inspection7/28/20177/31/20178/2/2017 11:14:55 AMAPASS
Dried slurry in gutter has been swept. BMPs installed. Vertical construciton in progress, no fugitive dust or trackout issues. Approved.
ESC16-00945 General Inspection7/28/20177/31/20178/2/2017 10:44:25 AMPCANC
ESC16-01098 General Inspection7/31/20177/31/20178/2/2017 10:39:07 AM CANC
ESC16-01189 General Inspection7/28/20177/31/20178/2/2017 10:20:09 AMACANC
ESC16-00894 General Inspection7/31/20177/31/20178/1/2017 10:59:23 AM CANC
ESC16-01213 General Inspection7/31/20177/31/20178/1/2017 10:59:09 AM CANC
ESC16-01483 General Inspection7/31/20177/31/20178/1/2017 10:58:40 AM CANC
ESC16-00398 Aging Inspection7/31/20177/31/20178/1/2017 10:58:28 AM CANC
ESC16-01056 General Inspection7/31/20177/31/20178/1/2017 10:58:03 AM CANC
ESC16-00186 Aging Inspection7/31/20177/31/20178/1/2017 10:57:53 AM CANC
ESC16-01091 General Inspection7/31/20177/31/20178/1/2017 9:41:46 AM CANC
ESC14-01173 Aging Inspection7/31/20177/31/20178/1/2017 9:41:34 AM CANC
ESC16-01095 General Inspection7/31/20177/31/20178/1/2017 9:41:12 AM CANC
ESC12-00403 General Inspection7/31/20177/31/20178/1/2017 9:40:39 AM CANC
ESC16-01319 Site Final7/28/20177/31/20178/1/2017 9:38:24 AMPPASS
Work complete. Main site permit for Idaho Street townhomes is active. No construction activity at this time.
ESC16-00269 Aging Inspection7/31/20177/31/20178/1/2017 9:35:34 AM CANC
ESC15-00857 Complaint Inspection7/28/20177/31/20178/1/2017 9:35:09 AMAPEND
Compaint regarding trackout on Eyrie Way.

Verbal correction request on Friday PM to RP Jill to be prepared for trackout control and street sweeping during construction of the new access road.

A street sweeper was to be ordered for Friday PM or weekend. Water truck for dust control and compaction is one reason for the trackout. Storm drain has sediment filter mat installed.

A site meeting and walk through inspection is to be scheduled to review ESC controls around road and certain areas of phase 9.
ESC15-00651 Aging Inspection7/31/20177/31/20177/31/2017 2:01:06 PM CANC
ESC15-00651 DOC - Permit Finaled7/31/20177/31/20177/31/2017 2:01:01 PMPPASS