Inspections for the day of: Tuesday, July 31, 2018.
Number of inspections: 25
Percentage of inspections complete: 96 %
Percentage of inspections not complete: 4 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00079 BLD-Conference7/24/20187/24/2018 A 
(Spoke with Bob; stated to use same MIS) second complaint that contracting company is taking over parking lot with building matieral and trucks and working in space with no occupancy permit
BLD17-03218 BLD-Aging Inspection7/31/20187/31/20188/1/2018 7:27:17 AM CANC
BLD17-02414 BLD-Aging Inspection7/31/20187/31/20188/1/2018 7:26:52 AM PEND
BLD17-03692 BLD-Aging Inspection7/31/20187/31/20188/1/2018 7:26:27 AM PASS
MIS18-00086 MIS-Aging Inspection7/31/20187/31/20188/1/2018 7:25:25 AM DEFR
BLD16-04473 BLD-Aging Inspection7/31/20187/31/20187/31/2018 5:00:00 PM PASS
MIS18-00254 BLD-Conference7/17/20187/31/20187/31/2018 4:33:30 PMACANC
BLD17-04638 BLD-Final7/31/20187/31/20187/31/2018 4:33:21 PMPCANC
Vince Phone #: ###-####. This has already been finaled and issued C.O.
BLD18-00585 BLD-Final7/31/20187/31/20187/31/2018 3:41:39 PMPPASS
Late afternoon // Will Phone #: ###-####
BLD18-00585 DOC - Permit Finaled7/31/20187/31/20187/31/2018 3:41:31 PMPPASS
ESC17-01073 Site Final7/31/20187/31/20187/31/2018 2:40:49 PMPDONE
ESC17-01073 DOC - Permit Finaled7/31/20187/31/20187/31/2018 2:40:39 PMPPASS
BLD17-02866 BLD-Final7/30/20187/31/20187/31/2018 2:40:28 PMPFAIL
Saric Dragan Phone #: ###-####. Needs blower door test. Needs to firecailk all penetrations from common wall of garage and ceiling. Still needs mech. final.
BLD17-01019 BLD-Energy code compliance7/31/20187/31/20187/31/2018 1:52:34 PMPNR
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD18-02492 BLD-Final7/30/20187/31/20187/31/2018 1:27:46 PMPPASS
Please call ahead for access - Laura Phone #: ###-####. Ok for perm occ.
BLD17-03125 BLD-Final7/30/20187/31/20187/31/2018 10:23:17 AMANR
Vince Phone #: ###-####
want siding and foundation doubled check; cracking. Per Kristian Myer. Mech final has failed.
ESC17-01765 Site Final7/31/20187/31/20187/31/2018 10:22:42 AMADONE
ESC17-01765 DOC - Permit Finaled7/31/20187/31/20187/31/2018 10:22:34 AMPPASS
BLD17-04638 BLD-Final7/30/20187/31/20187/31/2018 10:22:20 AMAPASS
BLD17-04638 DOC - Permit Finaled7/31/20187/31/20187/31/2018 10:20:12 AMPPASS
All issues have been resolved.
BLD17-04638 BLD-Blower Door Test Results7/31/20187/31/20187/31/2018 10:15:51 AMADONE
3.8 ach @ 50pa
BLD18-02483 BLD-Footing7/30/20187/31/20187/31/2018 9:59:56 AMAPART
Please call ahead // Jose Phone #: ###-####
BLD17-04447 BLD-Footing7/30/20187/31/20187/31/2018 9:27:03 AMAPASS
Mike, requesting rebar inspection Tuesday 10 am, we will have rebar in gym floor, elevator, stair tower walls, and exterior footings, 235 yards to be placed Wednesday morning 3 am. Strata will be inspecting rebar and concrete testing Phone #: ###-#### Inspection requested via web by Jim Carriveau
BLD17-03648 BLD-Energy code compliance7/30/20187/31/20187/31/2018 9:02:51 AMAPASS
Jose Phone #: ###-####. Exterior walls, north of gridline 2 only, 1st. floor.
BLD17-03648 BLD-Framing/Rough-in7/31/20187/31/20187/31/2018 9:02:17 AMAPART
Jose Phone #: ###-####. Interior steel stud framed walls, 1st. and 2nd. floors north of gridline 2. pending plumbing rough in inspection.