MEC18-03675
| Rough-in | 7/31/2018 | 7/31/2018 | 7/31/2018 4:09:35 PM | P | FAIL |
|
|
- B vent for furnace needs 1" clearances in the crawl space, main floor in the closet where in goes into the wall, and i need to see an insulation sheild in the attic -Main supply trunk in the crawl is laying on the ground and has the B vent laying on it- supply branches need dampers for air balancing and supply boots sealed - need service dissconnect for the furnace in the crawl space and a light - need to know where the crawl access is going to be and how big it is going to be for removal of equipment if needed - Line set insulation needs fixed and UV tape- penetration out the foundation needs to be sealed and the breaker size is too large- power whip to A/C needs to be weather tight - range hood vent is not tied into termination properly - need to see that the permit has exhaust fans, range hood,and duct work added and fees paid - Man J. needs to be performed and approved by the city of boise
|
MEC18-03745
| Final | 7/31/2018 | 7/31/2018 | 7/31/2018 3:40:37 PM | P | PASS |
|
|
Please call on way: Tyrel ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- RTU # 3 final ok
|
MEC18-03663
| Rough-in | 7/31/2018 | 7/31/2018 | 7/31/2018 3:21:22 PM | P | PASS |
|
|
Pressure test and Rough in Please call ahed for lock box code // Eddie Phone #: ###-#### fireplace R/I ok- 20lb gas pressure test ok
|
MEC17-02479
| Mec-Aging Inspection | 7/31/2018 | 7/31/2018 | 7/31/2018 2:58:00 PM | | CANC |
|
|
|
MEC18-03675
| Rough-in | 7/30/2018 | 7/31/2018 | 7/31/2018 2:13:11 PM | P | FAIL |
|
|
vacant, call for access code - Steve Phone #: ###-####- no access called steve and left message
|
MEC18-03150
| Final | 7/30/2018 | 7/31/2018 | 7/31/2018 2:08:02 PM | P | PASS |
|
|
**** same customer as permit # MEC18-03096. Would like this inspection first. Please call Wendy 30 min prior to arrival. Phone #: ###-#### Inspection requested via web by Andrea Grigsby - furnace ac coil ok
|
MEC18-03096
| Final | 7/30/2018 | 7/31/2018 | 7/31/2018 1:53:40 PM | P | PASS |
|
|
*** same customer as MEC18-03150. They would like 3316 Bridgecourt inspected first please. Please call Wendy 30 min prior to arrival. Phone #: ###-#### Inspection requested via web by Andrea Grigsby - furnace ac coil co ok
|
MEC18-03719
| Final | 7/30/2018 | 7/31/2018 | 7/31/2018 1:16:58 PM | P | PASS |
|
|
Please call Kyle to ensure install is complete. Thank you! ###-#### Phone #: ###-#### Inspection requested via web by Rick Borg - A/C coil co ok
|
MEC17-04966
| Mec-Aging Inspection | 7/31/2018 | 7/31/2018 | 7/31/2018 1:05:04 PM | | DONE |
|
|
called contractor to schedule inspection with homeowner
|
MEC17-04978
| Mec-Aging Inspection | 7/31/2018 | 7/31/2018 | 7/31/2018 1:01:35 PM | | DONE |
|
|
called contractor about scheduling inspection but no answered left a message
|
MEC18-03653
| Final | 7/26/2018 | 7/31/2018 | 7/31/2018 11:29:06 AM | A | PASS |
|
|
Call Barbara at ###-#### to coordinate Phone #: ###-#### Inspection requested via web by Sabrina DeHority- furnace ac coil co ok
|
MEC18-03592
| Final | 7/30/2018 | 7/31/2018 | 7/31/2018 11:00:25 AM | A | FAIL |
|
|
Please inspect about 10 AM if possible and call Raymond Hansen prior to inspection. ###-####. Phone #: ###-#### Inspection requested via web by Mary LaFayette- need a 90 on the condensate turned down- ac coil co ok
|
MEC18-03665
| Rough-in | 7/31/2018 | 7/31/2018 | 7/31/2018 10:35:42 AM | A | PASS |
|
|
Inspection requested via web by Floyd Floyd Peek- water heater flue ok- R/I ok - 20lb gas pressure test ok- 5lb flue pressure ok
|
MEC18-02476
| Rough-in | 7/30/2018 | 7/31/2018 | 7/31/2018 10:16:16 AM | A | PART |
|
|
Please Re-inspect 104-204-303-304 . thanks Phone #: ###-#### Inspection requested via web by Gary Reeves- R/I ok
|
MEC18-03598
| Pressure Test | 7/30/2018 | 7/31/2018 | 7/31/2018 10:07:10 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Chris Field- 20lb gas pressure test ok
|
MEC18-03663
| Rough-in | 7/26/2018 | 7/31/2018 | 7/31/2018 10:05:42 AM | A | NH |
|
|
Phone #: ###-#### Inspection requested via web by Brian Preece- no access needed a code lock box
|
MEC18-03663
| Pressure Test | 7/26/2018 | 7/31/2018 | 7/31/2018 10:04:49 AM | A | NH |
|
|
Phone #: ###-#### Inspection requested via web by Brian Preece- no access
|
MEC18-03743
| Final | 7/30/2018 | 7/31/2018 | 7/31/2018 9:41:13 AM | A | PASS |
|
|
Call customer to meet you a the house /jobsite. Thanks if any other questions Call Tim ###-#### Phone #: ###-#### Inspection requested via web by Rene Neumeyer- final ok
|
MEC18-03743
| Rough-in | 7/30/2018 | 7/31/2018 | 7/31/2018 9:40:51 AM | A | PASS |
|
|
Call customer to meet you a the house /jobsite. Thanks if any other questions Call Tim ###-#### Phone #: ###-#### Inspection requested via web by Rene Neumeyer- clearances ok -R/I ok
|
MEC18-02222
| Final | 7/30/2018 | 7/31/2018 | 7/31/2018 9:02:55 AM | A | CANC |
|
|
(gas/range)- Johnny Phone #: ###-#### should have been a R/I for the range- i also need to see a 5lb flue test on upstairs furnace still
|
MEC18-02222
| Rough-in | 7/31/2018 | 7/31/2018 | 7/31/2018 9:02:19 AM | P | PASS |
|
|
(gas/range)- Johnny Phone #: ###-#### R/I ok on range
|