BLD16-03440
| BLD-Final | 7/31/2020 | 7/31/2020 | 8/3/2020 2:56:32 PM | P | PASS |
|
|
Dillan *screened* Phone #: ###-####
|
BLD18-04073
| BLD-Framing/Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 1:11:30 PM | P | PASS |
|
|
Inspection for the last 7 units in building 6 for sheet rock. Gate code is 1379#. There are no fire barrier walls on this inspection. Phone #: ###-#### Inspection requested via web by chad stradley
|
BLD20-01323
| BLD-Framing/Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 1:11:06 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//ok to insulate// pending hvac aprovals.
|
BLD20-01324
| BLD-Framing/Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 1:10:38 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson max 12 inches into 36 inch setback 1 hr eave west end of building.// ok to insulate// pending hvac aprovals.
|
BLD20-01594
| BLD-Energy code compliance | 7/31/2020 | 7/31/2020 | 7/31/2020 12:59:28 PM | P | PART |
|
|
todd Phone #: ###-#### Inspection requested via web by Todd Twedt fire spk no aproved need insp for cover by fire insp// insulation insp aproved pending fire.
|
BLD20-02017
| BLD-Framing/Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 12:30:30 PM | A | FAIL |
|
|
Minor framing added to make a bedroom and fir some walls out for plumbing etc. Not sure if it needs inspected. If it does please inspect. Phone #: ###-#### Inspection requested via web by Nick Schuler sd/trade sign offs
|
BLD19-00707
| BLD-Aging Inspection | 7/31/2020 | 7/31/2020 | 7/31/2020 11:02:34 AM | | PASS |
|
|
|
BLD20-01594
| BLD-Framing/Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 11:01:54 AM | A | PASS |
|
|
todd Phone #: ###-#### Inspection requested via web by Todd Twedt
|
BLD20-02258
| DOC - Permit Finaled | 7/31/2020 | 7/31/2020 | 7/31/2020 10:50:01 AM | P | PASS |
|
|
|
BLD19-03392
| BLD-Blower Door Test Results | 7/24/2020 | 7/31/2020 | 7/31/2020 10:49:26 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall 5.98
|
BLD19-03606
| BLD-Framing/Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 10:13:17 AM | A | PASS |
|
|
Screened- Jeff Phone #: ###-#### walls/soffts and hard lids ok to cover 1st floor phase 2
|
BLD20-01578
| BLD-Framing/Rough-in | 7/30/2020 | 7/31/2020 | 7/30/2020 3:00:12 PM | A | CANC |
|
|
Todd Phone #: ###-#### >> Inspection requested via web by Todd Twedt Inspection cancelled from web by: Todd Twedt
|