PLM01-00992
| PLM-Aging Inspection | 7/5/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | | PASS |
|
|
|
PLM01-00993
| PLM-Aging Inspection | 7/5/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | | PASS |
|
|
|
PLM01-02187
| Plumbing Rough-in | 7/3/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | A | PASS |
|
|
Rob ###-####
|
PLM00-03611
| Final | 7/3/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/03/2001 at 14:31:20. Contact: ###-####.still needs the st-12 7/5/2001 8:47:39 AM
|
PLM01-01686
| Plumbing Rough-in | 7/5/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 330 On 7/5/2001 7:56:37 AM sewer water to garage and ri for wc and lav ok water still needs to be run to lav 7/5/2001 2:29:36 PM
|
PLM01-01339
| Final | 7/5/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-02205
| Plumbing Rough-in | 7/5/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | P | FAIL |
|
|
###-#### provide a shutoff valve in each unit to control only water for that unit, the 2" waste at the connection with the 3" waste in the rear unit is backgraded, waste and vent and wate systems tests failed 7/5/2001 2:16:01 PM
|