ELE01-02245
| Electrical Rough-In | 7/3/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/03/2001 at 17:38:22. Contact: ###-####. p.v.c. conduit underground. 7/5/2001 10:36:54 AM
|
ELE00-04327
| Final | 7/3/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | A | PASS |
|
|
George ###-####. 7/5/2001 9:55:51 AM
completed. 7/5/2001 9:56:23 AM
|
ELE01-02071
| Final | 7/3/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/03/2001 at 12:18:37. Contact: ###-####.. completed. 7/5/2001 11:12:50 AM
|
ELE01-00851
| Electrical Rough-In | 7/3/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | P | PART |
|
|
###-####. ground level decking, southend r/i. 7/5/2001 1:47:01 PM
|
ELE01-01836
| Electrical Rough-In | 7/5/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | P | PASS |
|
|
###-####. sun-porch addition r/i. ok. 7/5/2001 1:00:34 PM
|
ELE01-00240
| Electrical Rough-In | 7/5/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | P | PART |
|
|
###-####. 1st floor; entry raised floor r/i. 2nd level; aerobics room ceiling r/i. ok. 7/5/2001 2:19:32 PM
|
ELE01-00849
| Final | 7/5/2001 | 7/5/2001 | 7/5/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/05/2001 at 10:11:18. Contact: ###-####. no one will be home until after 2:30
no access. at 3:00 pm. called contractor to reschedule... 7/5/2001 4:18:00 PM
|