Inspections for the day of: Thursday, July 5, 2001.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01789 BLD-Footing7/3/20017/5/20017/5/2001 12:00:00 AMAPASS
Mark ###-####
BLD01-01798 BLD-Footing7/3/20017/5/20017/5/2001 12:00:00 AMAFAIL
Scott Rosse ###-#### footings have been poured and no vertical rebar in garage front wall as required by approved plans,for Boise City alternate wall brace conditions, at this time they have started to pour the walls and I have stoped them due to, no rebar horizontal in the wall either, I have posted a correction notice to now have an engineer provide a detail for a fix, now that our code alternate can not be meet. 7/5/2001 12:44:51 PM
BLD01-01131 BLD-Energy code compliance7/3/20017/5/20017/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/03/2001 at 12:11:00. Contact: ###-####.
BLD01-01324 BLD-Framing/Rough-in7/3/20017/5/20017/5/2001 12:00:00 AMAFAIL
###-#### c/n posted. 7/5/2001 10:33:55 AM
BLD01-00994 BLD-Framing/Rough-in7/3/20017/5/20017/5/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 07/03/2001 at 13:41:18. Contact: .c/n posted. 7/5/2001 11:39:13 AM
BLD00-02840 BLD-Final7/3/20017/5/20017/5/2001 12:00:00 AMANR
Final - reinspect - Cathy has the card. ACHD has signed perm oc, now need prior c/n addressed. 7/5/2001 3:20:46 PM
BLD01-00764 BLD-Final7/5/20017/5/20017/5/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/05/2001 at 06:54:25. Contact: ###-####. not ready need to install finished floor coverings before a final inspection can be called for Boise City policy. posted notice on front window no inspection done. 7/5/2001 11:58:19 AM
BLD01-00409 BLD-Final7/5/20017/5/20017/5/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 07/05/2001 at 06:55:32. Contact: ###-####.c/n posted for hand rail not terminating as per code. 7/5/2001 12:58:17 PM
MEC01-01772 Rough-in7/5/20017/5/20017/5/2001 12:00:00 AMAPASS
Added by Inspector: 407 On 7/5/2001 11:47:14 AM
BLD01-00737 BLD-Foundation7/5/20017/5/20017/5/2001 12:00:00 AMPPART
###-####subject to s-i. 7/5/2001 3:25:19 PM
BLD01-01073 BLD-Final7/5/20017/5/20017/5/2001 12:00:00 AMPFAIL
Mike ###-####, plan check has noted to provide 1 accessable entrance to building need slope to existing exterior landing. 7/5/2001 1:59:54 PM
BLD01-01721 BLD-Footing7/3/20017/5/20017/5/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 07/03/2001 at 16:30:59. Contact: ###-####. 2:15 now and no form boards are at the site yet. 7/5/2001 2:23:51 PM