Inspections for the day of: Thursday, July 5, 2007.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00528 INSP-Sprinkler Rough-in/Hydro7/5/20077/5/20077/5/2007 6:40:39 PMPPASS
Underground hydro test passed.
FIR07-00527 INSP-Sprinkler Rough-in/Hydro7/5/20077/5/20077/5/2007 6:40:12 PMPPASS
Underground hydro passed
BLD07-00471 FIRE-Final Inspection7/5/20077/5/20077/5/2007 12:47:23 PMPFAIL
Provide approved hardware on the pocket door as discussed, repair all exit signs and emergency lights.
FIR07-00484 INSP-Sprinkler Rough-in7/5/20077/5/20077/5/2007 12:36:01 PMPPASS
The underground supply line is now ok to bury. The connection to united water still needs to be done.
BLD07-00097 FIRE-Final Inspection7/5/20077/5/20077/5/2007 11:24:17 AMPFAIL
The exit discharge light has not been installed yet.
FIR07-00455 INSP-Final Inspection7/5/20077/5/20077/5/2007 11:23:33 AMPPASS
Permit finaled
FIR07-00455 INSP-Sprinkler Rough-in7/2/20077/5/20077/5/2007 11:22:44 AMPPASS
Suppression system operated correctly
BLD06-03577 FIRE-Final Inspection7/2/20077/5/20077/5/2007 10:19:25 AMAPASS
Life safety passed. The fire extinguisher is going to be delivered by simplexgrinnel. I had the contractor remove the thumbturn lock as I waited.
BLD07-00648 FIRE-Final Inspection7/3/20077/5/20077/5/2007 9:58:51 AMAPASS
Life safety passed
FIR07-00543 INSP-Final Inspection7/3/20077/5/20077/5/2007 9:57:43 AMAPASS
permit finaled
FIR07-00103 INSP-Sprinkler Rough-in7/3/20077/5/20077/5/2007 9:33:37 AMAPASS
The second floor tenant improvement sprinkler piping is ok to cover. Four hangers need to be added in the Conference room to the west of the elevators. The room in the northwest corner of the building is experiencing changes and has no ceiling yet.