BLD12-01006
| FIRE-Sprinkler Rough-in | 7/5/2012 | 7/5/2012 | 7/5/2012 3:22:59 PM | P | PASS |
|
|
The insulation backing in Suite 101 (book store) is complete
|
BLD12-00345
| BLD-Conference | 7/5/2012 | 7/5/2012 | 7/5/2012 2:37:37 PM | A | DONE |
|
|
Jim and I met with the general contractor to discuss outstanding issues for sign offs on pnhase 1,2, and 3. Jim is going to take care of the door hardware requirements.
|
FIR12-00274
| INSP-Sprinkler Rough-in | 7/3/2012 | 7/5/2012 | 7/5/2012 2:19:55 PM | A | PART |
|
|
Upright coverage has been added but the insulation blockage issue has not been addressed yet. Piping can not be covered yet.
|
BLD12-00921
| FIRE-Alarm Testing | 7/5/2012 | 7/5/2012 | 7/5/2012 1:35:25 PM | P | CANC |
|
|
Please confirm 4:00 pm testing time. Phone #: ###-#### >> Inspection requested via web by David Krings Inspection cancelled from web by: David Krings
|
BLD12-01513
| FIRE-Final Inspection | 7/5/2012 | 7/5/2012 | 7/5/2012 12:57:33 PM | P | PASS |
|
|
Life safety passed
|
FIR12-00336
| INSP-Final Inspection | 7/3/2012 | 7/5/2012 | 7/5/2012 10:46:03 AM | A | PASS |
|
|
Permit finaled. Suppression system functioned correctly.
|