Inspections for the day of: Tuesday, July 5, 2016.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-02978 BLD-Aging Inspection7/5/20167/5/20167/6/2016 2:44:24 PM PEND
MIS16-00101 MIS-Aging Inspection7/5/20167/5/20167/6/2016 2:43:31 PM DONE
BLD15-02972 BLD-Aging Inspection7/5/20167/5/20167/6/2016 2:42:39 PM PEND
MIS15-00269 BLD-Conference7/5/20167/5/20167/5/2016 4:54:20 PMPDEFR
status review,, out of time
BLD16-00398 BLD-Final7/5/20167/5/20167/5/2016 4:53:26 PMPDONE
Luke Phone #: ###-####,, roof is overlayed
BLD16-00398 DOC - Permit Finaled7/5/20167/5/20167/5/2016 4:47:32 PMPPASS
done
MIS16-00206 BLD-Final7/5/20167/5/20167/5/2016 4:43:25 PMPPEND
talked with owner,, he did not know about getting a permit.. double fee NOT recommended but do if required.. he will come get permit
BLD16-01745 BLD-Footing7/5/20167/5/20167/5/2016 4:35:10 PMPNR
Derick Phone #: ###-####,, contractor just pulling up... no time to come back
BLD16-00086 BLD-Wall Bracing7/5/20167/5/20167/5/2016 4:31:39 PMPPASS
Luna Phone #: ###-####
BLD15-01956 BLD-Footing7/5/20167/5/20167/5/2016 3:28:43 PMPPART
Ren Phone #: ###-####,, work in progress,, no plans,, contractor to verify porch footing setbacks,, ok to pour at contractors risk
BLD16-01858 BLD-Framing/Rough-in7/5/20167/5/20167/5/2016 3:21:02 PMPPASS
Dan Phone #: ###-####
BLD16-01039 BLD-Foundation7/5/20167/5/20167/5/2016 2:27:55 PMPPART
Sergio Phone #: ###-####,, work in progress
BLD16-00887 BLD-Framing/Rough-in7/5/20167/5/20167/5/2016 2:13:56 PMPPART
Inspection requested via web by Kyle Buzzell,, need to verify headers on 2nd level on the east side,, ok to insulate
BLD16-02094 BLD-Framing/Rough-in7/5/20167/5/20167/5/2016 1:37:58 PMPPART
Berry Phone #: ###-####,,post and beam ok,, will need to pull trades permits for other work
BLD15-03583 BLD-Final7/1/20167/5/20167/5/2016 12:26:32 PMANR
Rod Phone #: ###-####,, need to verify f/l/s
BLD16-00023 Extend Permit 90/180 days7/1/20167/5/20167/5/2016 12:25:16 PMAPEND
Project completed? Special inspection report provided? status review
BLD14-03039 BLD-Conference7/1/20167/5/20167/5/2016 12:23:58 PMAPART
Jay Phone #: ###-####,, floor/ ceiling penetrations ok,, shell ok pending other trades
BLD16-01048 BLD-Framing/Rough-in6/30/20167/5/20167/5/2016 11:53:57 AMAFAIL
Peter Phone #: ###-####,, correction notice posted
BLD15-04009 BLD-Final6/29/20167/5/20167/5/2016 11:32:42 AMAPASS
Phone #: ###-#### Inspection requested via web by Tim Scheibe
BLD15-04009 DOC - Permit Finaled7/5/20167/5/20167/5/2016 11:32:30 AMPPASS
c of c/o issued,, placed in drawer upstairs
BLD16-00256 BLD-Wall Bracing6/30/20167/5/20167/5/2016 11:25:22 AMAPASS
Exterior shear inspection completed and passed. This inspection is for Drywall Shear inspection. Several areas inside with 7" screw pattern completed. Call Steve with any questions. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
BLD16-00809 BLD-Framing/Rough-in6/30/20167/5/20167/5/2016 11:24:15 AMAPART
Steve Phone #: ###-####,, needs straps from new to existing,, needs seal package,, ok to insulate
MIS16-00204 BLD-Conference7/1/20167/5/20167/5/2016 10:47:43 AMADONE
Stop work order for working on roof without permits. Any questions speak with Phil // permit issued
MIS16-00094 DOC - Permit Finaled7/5/20167/5/20167/5/2016 10:46:25 AMPPASS