BLD15-02978
| BLD-Aging Inspection | 7/5/2016 | 7/5/2016 | 7/6/2016 2:44:24 PM | | PEND |
|
|
|
MIS16-00101
| MIS-Aging Inspection | 7/5/2016 | 7/5/2016 | 7/6/2016 2:43:31 PM | | DONE |
|
|
|
BLD15-02972
| BLD-Aging Inspection | 7/5/2016 | 7/5/2016 | 7/6/2016 2:42:39 PM | | PEND |
|
|
|
MIS15-00269
| BLD-Conference | 7/5/2016 | 7/5/2016 | 7/5/2016 4:54:20 PM | P | DEFR |
|
|
status review,, out of time
|
BLD16-00398
| BLD-Final | 7/5/2016 | 7/5/2016 | 7/5/2016 4:53:26 PM | P | DONE |
|
|
Luke Phone #: ###-####,, roof is overlayed
|
BLD16-00398
| DOC - Permit Finaled | 7/5/2016 | 7/5/2016 | 7/5/2016 4:47:32 PM | P | PASS |
|
|
done
|
MIS16-00206
| BLD-Final | 7/5/2016 | 7/5/2016 | 7/5/2016 4:43:25 PM | P | PEND |
|
|
talked with owner,, he did not know about getting a permit.. double fee NOT recommended but do if required.. he will come get permit
|
BLD16-01745
| BLD-Footing | 7/5/2016 | 7/5/2016 | 7/5/2016 4:35:10 PM | P | NR |
|
|
Derick Phone #: ###-####,, contractor just pulling up... no time to come back
|
BLD16-00086
| BLD-Wall Bracing | 7/5/2016 | 7/5/2016 | 7/5/2016 4:31:39 PM | P | PASS |
|
|
Luna Phone #: ###-####
|
BLD15-01956
| BLD-Footing | 7/5/2016 | 7/5/2016 | 7/5/2016 3:28:43 PM | P | PART |
|
|
Ren Phone #: ###-####,, work in progress,, no plans,, contractor to verify porch footing setbacks,, ok to pour at contractors risk
|
BLD16-01858
| BLD-Framing/Rough-in | 7/5/2016 | 7/5/2016 | 7/5/2016 3:21:02 PM | P | PASS |
|
|
Dan Phone #: ###-####
|
BLD16-01039
| BLD-Foundation | 7/5/2016 | 7/5/2016 | 7/5/2016 2:27:55 PM | P | PART |
|
|
Sergio Phone #: ###-####,, work in progress
|
BLD16-00887
| BLD-Framing/Rough-in | 7/5/2016 | 7/5/2016 | 7/5/2016 2:13:56 PM | P | PART |
|
|
Inspection requested via web by Kyle Buzzell,, need to verify headers on 2nd level on the east side,, ok to insulate
|
BLD16-02094
| BLD-Framing/Rough-in | 7/5/2016 | 7/5/2016 | 7/5/2016 1:37:58 PM | P | PART |
|
|
Berry Phone #: ###-####,,post and beam ok,, will need to pull trades permits for other work
|
BLD15-03583
| BLD-Final | 7/1/2016 | 7/5/2016 | 7/5/2016 12:26:32 PM | A | NR |
|
|
Rod Phone #: ###-####,, need to verify f/l/s
|
BLD16-00023
| Extend Permit 90/180 days | 7/1/2016 | 7/5/2016 | 7/5/2016 12:25:16 PM | A | PEND |
|
|
Project completed? Special inspection report provided? status review
|
BLD14-03039
| BLD-Conference | 7/1/2016 | 7/5/2016 | 7/5/2016 12:23:58 PM | A | PART |
|
|
Jay Phone #: ###-####,, floor/ ceiling penetrations ok,, shell ok pending other trades
|
BLD16-01048
| BLD-Framing/Rough-in | 6/30/2016 | 7/5/2016 | 7/5/2016 11:53:57 AM | A | FAIL |
|
|
Peter Phone #: ###-####,, correction notice posted
|
BLD15-04009
| BLD-Final | 6/29/2016 | 7/5/2016 | 7/5/2016 11:32:42 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tim Scheibe
|
BLD15-04009
| DOC - Permit Finaled | 7/5/2016 | 7/5/2016 | 7/5/2016 11:32:30 AM | P | PASS |
|
|
c of c/o issued,, placed in drawer upstairs
|
BLD16-00256
| BLD-Wall Bracing | 6/30/2016 | 7/5/2016 | 7/5/2016 11:25:22 AM | A | PASS |
|
|
Exterior shear inspection completed and passed. This inspection is for Drywall Shear inspection. Several areas inside with 7" screw pattern completed. Call Steve with any questions. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD16-00809
| BLD-Framing/Rough-in | 6/30/2016 | 7/5/2016 | 7/5/2016 11:24:15 AM | A | PART |
|
|
Steve Phone #: ###-####,, needs straps from new to existing,, needs seal package,, ok to insulate
|
MIS16-00204
| BLD-Conference | 7/1/2016 | 7/5/2016 | 7/5/2016 10:47:43 AM | A | DONE |
|
|
Stop work order for working on roof without permits. Any questions speak with Phil // permit issued
|
MIS16-00094
| DOC - Permit Finaled | 7/5/2016 | 7/5/2016 | 7/5/2016 10:46:25 AM | P | PASS |
|
|
|