FIR16-00421
| INSP-Final Inspection | 7/1/2016 | 7/5/2016 | 7/5/2016 12:40:30 PM | A | FAIL |
|
|
Two painted heads need replaced.
|
FIR16-00023
| INSP-Final Inspection | 7/5/2016 | 7/5/2016 | 7/5/2016 12:36:06 PM | P | CANC |
|
|
Cancel per Cole Phone #: ###-####
|
FIR16-00081
| INSP-Final Inspection | 7/5/2016 | 7/5/2016 | 7/5/2016 11:28:39 AM | P | FAIL |
|
|
Provide inspectors test/drain as per approved plans, riser in garage closet needs to be installed with-in 1 1/2" of wall or needs to be steel, most of the piping in the basement does not meet the installation requirements for exposed piping in unfinished basements per the Spears Manual.
|
FIR16-00171
| INSP-Sprinkler Rough-in | 7/1/2016 | 7/5/2016 | 7/5/2016 8:53:37 AM | A | PASS |
|
|
Kitchen area pendant heads ok to cover. I noted the the dry pendant in the Produce Cooler is overspaced and will be rechecked at the final.
|
FIR16-00379
| INSP-Final Inspection | 7/5/2016 | 7/5/2016 | 7/5/2016 8:50:45 AM | P | PASS |
|
|
Permit finaled
|
BLD16-00710
| FIRE-Final Inspection | 7/4/2016 | 7/5/2016 | 7/5/2016 8:48:04 AM | A | PART |
|
|
A30 day temporary occupancy, for fire, is being given with scott's permission until the fire alarm modifications have been addressed.
|
FIR16-00282
| INSP-Final Inspection | 7/1/2016 | 7/5/2016 | 7/5/2016 8:27:28 AM | A | FAIL |
|
|
This inspection is not for a final. But for approval for the tenting on the south half of the third floor. Piping can be covered.
|
BLD15-01869
| FIRE-Conference | 7/5/2016 | 7/5/2016 | 7/5/2016 8:22:23 AM | A | DONE |
|
|
Reading on the guage this morning was 70psi
|
FIR15-00822
| INSP-Conference | 7/5/2016 | 7/5/2016 | 7/5/2016 8:21:50 AM | A | DONE |
|
|
Reading on the guage this morning was 70psi
|