BLD00-02233
| FIRE-Final Inspection | 7/5/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/05/2001 at 10:20:03. Contact: ###-####. comm cable penetration in corridor between doors to be fixed for structural inspector 7/6/2001 9:01:40 AM
|
FIR01-00127
| INSP-Final Inspection | 7/6/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | A | NR |
|
|
Scheduled by Inspector: 409 On 7/6/2001 8:01:45 AM they will reschedule for a later date 7/6/2001 1:22:33 PM
|
BLD97-02548
| FIRE-Final Inspection | 7/6/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | P | NR |
|
|
###-#### talked to Jack of Mtn Alarm and they won't be ready until 7/9. 7/6/2001 2:51:11 PM
|