BLD01-01110
| BLD-Other | 7/5/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/05/2001 at 11:41:13. Contact: ###-####. ok to side. 7/5/2001 2:04:33 PM
|
BLD01-00339
| BLD-Framing/Rough-in | 7/5/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | A | FAIL |
|
|
Joe, ###-#### c/n electrical final needed--verify c/n items completed. 7/6/2001 11:46:05 AM
|
BLD01-01351
| BLD-Framing/Rough-in | 7/5/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | A | PASS |
|
|
###-#### ok to side--SHEAR PANEL INSPECTION 7/6/2001 8:02:49 AM
|
BLD01-01324
| BLD-Framing/Rough-in | 7/5/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | A | PASS |
|
|
shear --frank- ###-#### shear--ok to side, c/n items corrected. 7/6/2001 9:48:31 AM
|
MEC01-01532
| Final | 7/5/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/05/2001 at 14:57:10. Contact: ###-####.
|
BLD01-00409
| BLD-Final | 7/5/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/05/2001 at 17:27:27. Contact: ###-####. C. of C. #20449 issued. 7/6/2001 11:01:46 AM
|
BLD01-00004
| BLD-Final | 7/6/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 06:53:00. Contact: ###-####. Cancelled by contractor 7/6/2001 9:47:54 AM
|
MEC01-01805
| Rough-in | 7/6/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 06:59:49. Contact: ###-####.
|
BLD01-00836
| BLD-Framing/Rough-in | 7/5/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | A | PART |
|
|
###-#### c/n issued--ok to insulate 7/6/2001 8:29:18 AM
|
BLD01-01259
| BLD-Framing/Rough-in | 7/5/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | P | FAIL |
|
|
###-#### C/N posted on site--Do not side. 7/6/2001 1:40:41 PM
|
BLD00-03625
| BLD-Wall cover | 7/6/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 09:14:14. Contact: ###-####. C/N Per c/n dated 7-3-01 the fireblocking/draftstop above fir outed in lower level needs completion. Completed insulation/vapor barrier.--Do not cover 7/6/2001 12:23:23 PM
|
BLD01-01628
| BLD-Footing | 7/6/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 09:36:17. Contact: ###-####. wip 7/6/2001 2:59:07 PM
|
MEC01-01977
| Final | 7/6/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | P | PASS |
|
|
POOL HEATER ###-#### Pressure test--ok 7/6/2001 12:38:14 PM
|
BLD01-00730
| BLD-Final | 7/6/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 11:05:43. Contact: ###-####. C. of C. #20450 issued. 7/6/2001 1:03:09 PM
|
BLD01-01535
| BLD-Framing/Rough-in | 7/5/2001 | 7/6/2001 | 7/6/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/05/2001 at 17:08:26. Contact: ###-####. C/N posted-ok to insulate pending electrical rough in approval. 7/6/2001 2:13:55 PM
|