Inspections for the day of: Friday, July 6, 2001.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01683 BLD-Foundation7/5/20017/6/20017/6/2001 12:00:00 AMAPASS
fd-- jim-- ###-####
BLD01-01073 BLD-Final7/5/20017/6/20017/6/2001 12:00:00 AMANR
Mike ###-####
Mike 941 -1474
7/6/2001 9:15:47 AM
BLD00-02219 BLD-Final7/5/20017/6/20017/6/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 07/05/2001 at 14:13:56. Contact: ###-####. need per occ from dist health fire caulk mec rooms uni sex sign cry room 7/6/2001 11:07:05 AM
BLD01-01232 BLD-Final7/5/20017/6/20017/6/2001 12:00:00 AMANR
Mark Bird ###-#### needs elec final and plumbing final 7/6/2001 9:59:36 AM
BLD01-01721 BLD-Footing7/5/20017/6/20017/6/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/05/2001 at 17:12:26. Contact: ###-####.
MEC01-01973 Rough-in7/6/20017/6/20017/6/2001 12:00:00 AMPPASS
TODD ###-#### R/I
BLD01-00329 BLD-Framing/Rough-in7/6/20017/6/20017/6/2001 12:00:00 AMPFAIL
TODD ###-#### FR 7/6/2001 12:20:00 PM 7/6/2001 2:14:00 PM 7/6/2001 3:05:16 PM c/n on site 7/6/2001 3:06:20 PM
MEC01-01974 Rough-in7/6/20017/6/20017/6/2001 12:00:00 AMPPASS
TODD ###-#### R/I
BLD01-00330 BLD-Framing/Rough-in7/6/20017/6/20017/6/2001 12:00:00 AMPFAIL
FR TODD ###-#### c/n on site 7/6/2001 3:07:16 PM
MEC01-01975 Rough-in7/6/20017/6/20017/6/2001 12:00:00 AMPPASS
R/I TODD ###-####
BLD01-00331 BLD-Framing/Rough-in7/6/20017/6/20017/6/2001 12:00:00 AMPFAIL
FR ###-#### TODD c/n on site 7/6/2001 3:07:55 PM
MEC01-01976 Rough-in7/6/20017/6/20017/6/2001 12:00:00 AMPPASS
R/I TODD ###-####
BLD01-00332 BLD-Framing/Rough-in7/6/20017/6/20017/6/2001 12:00:00 AMPFAIL
FR TODD ###-#### c/n on site 7/6/2001 3:08:40 PM
MEC01-01974 Pressure Test7/6/20017/6/20017/6/2001 12:00:00 AMPPASS
Added by Inspector: 425 On 7/6/2001 3:06:52 PM
MEC01-01975 Pressure Test7/6/20017/6/20017/6/2001 12:00:00 AMPPASS
Added by Inspector: 425 On 7/6/2001 3:07:35 PM
MEC01-01973 Pressure Test7/6/20017/6/20017/6/2001 12:00:00 AMPPASS
Added by Inspector: 425 On 7/6/2001 3:05:46 PM
MEC01-01976 Pressure Test7/6/20017/6/20017/6/2001 12:00:00 AMPPASS
Added by Inspector: 425 On 7/6/2001 3:08:17 PM
BLD01-01553 BLD-Final7/6/20017/6/20017/6/2001 12:00:00 AMPPART
Added by Inspector: 425 On 7/6/2001 4:31:48 PM c /n needs fire perm occ and door hardware on exit door in store room changed and molding in bathroom along floor ok for temp occ