Inspections for the day of: Thursday, July 6, 2006.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM06-01334 Groundwork7/6/20067/6/20067/6/2006 4:30:38 PMPFAIL
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie test failed on roof strrom drains
PLM06-00358 Final7/6/20067/6/20067/6/2006 3:32:24 PMPNH
jp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie no access
PLM05-04309 Plumbing Rough-in7/6/20067/6/20067/6/2006 1:55:46 PMPPART
Scheduled by a contractor via Hello! on 7/6/2006 at 7:53:31 AM. Contact: ###-####.DWV test ok for room,s 37610,37614,37611, 37212,37615,37202,37417,37620,and 37419
PLM06-02259 Med/Gas Systems7/5/20067/6/20067/6/2006 1:03:26 PMAPART
jade(cell#); Phone #: ###-#### Internet Inspection Request from: Barbara Buckley relocation of med gas in second floor ceiling pressure test ok med gas on third floor start of 24 hr test
PLM06-01334 Groundwork7/5/20067/6/20067/6/2006 9:59:39 AMAPART
mike ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley need to correct leak on rain drain contractor to recall when ready
PLM06-02173 Plumbing Rough-in7/5/20067/6/20067/6/2006 9:58:28 AMAFAIL
JOHN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles test failed on DWV need to retest need to repipe vent for tub and shower in master bath need to be 6 inches above flood level of tub on horizontal portion of vent talked to plumber on site will recall when ready