FIR06-00493
| INSP-Final Inspection | 7/6/2006 | 7/6/2006 | 7/7/2006 10:16:07 AM | P | DEFR |
|
|
Inspection scheduled for friday 7/7 as discussed.
|
FIR06-00140
| INSP-Sprinkler Rough-in/Hydro | 7/5/2006 | 7/6/2006 | 7/6/2006 3:09:48 PM | A | PART |
|
|
OH rough-in for the area as marked on approved plans is good for cover at the drop ceilings.
|
BLD05-03413
| FIRE-Final Inspection | 7/5/2006 | 7/6/2006 | 7/6/2006 3:08:34 PM | A | FAIL |
|
|
Need to install exit signs per red line notes on approved plan set and as discussed on site, provide key box for FD use, provide sheetrock at the basement soffit where separation between fire sprinklers was designed, provide paint for flooring at the basement path of egress as indicated on approved plans, need to test emergency lighting at next inspection.
|