BLD06-01327
| BLD-Final | 7/6/2007 | 7/6/2007 | 7/6/2007 4:14:48 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 7/6/2007 at 12:38:02 AM. No approved plans on site.
|
BLD06-01449
| BLD-Final | 7/5/2007 | 7/6/2007 | 7/6/2007 3:19:55 PM | P | NR |
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. Needs mech. final and public works.
|
BLD07-01135
| BLD-Foundation | 7/6/2007 | 7/6/2007 | 7/6/2007 2:52:17 PM | P | PASS |
|
|
preston Phone #: ###-####. Stemwall ok.
|
BLD05-02685
| BLD-Framing/Rough-in | 7/5/2007 | 7/6/2007 | 7/6/2007 1:59:29 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Nick Latina. ok to insul.
|
BLD07-01128
| BLD-Framing/Rough-in | 7/6/2007 | 7/6/2007 | 7/6/2007 1:41:18 PM | P | PASS |
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. All issues resolved. Also performed energy code insp. ok.
|
BLD07-01098
| BLD-Framing/Rough-in | 7/6/2007 | 7/6/2007 | 7/6/2007 1:27:15 PM | P | PART |
|
|
todd Phone #: ###-####. Framing ok, elec ri not done. Will do another framing insp. after elec ri.
|
BLD07-01005
| BLD-Final | 7/6/2007 | 7/6/2007 | 7/6/2007 12:35:52 PM | A | PASS |
|
|
|
MIS05-00235
| DOC - Permit Finaled | 7/6/2007 | 7/6/2007 | 7/6/2007 12:35:38 PM | P | PASS |
|
|
Footing was evaluated by engineer and accepted as is by engineer. Paperwork was scanned in to permit.
|
BLD07-01005
| BLD-Foundation | 7/5/2007 | 7/6/2007 | 7/6/2007 11:46:12 AM | A | PASS |
|
|
GARY; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
BLD07-01116
| BLD-Final | 7/5/2007 | 7/6/2007 | 7/6/2007 10:10:53 AM | A | DONE |
|
|
per sly
|
BLD07-01116
| DOC - Permit Finaled | 7/6/2007 | 7/6/2007 | 7/6/2007 10:10:43 AM | P | PASS |
|
|
|