ELE09-00643
| Final | 7/6/2009 | 7/6/2009 | 7/6/2009 4:30:02 PM | P | PASS |
|
|
daryl Phone #: ###-####Ok final.
|
ESC07-00811
| General Inspection | 7/6/2009 | 7/6/2009 | 7/6/2009 4:28:43 PM | P | PASS |
|
|
Site look good.
|
ELE09-01169
| Final | 7/6/2009 | 7/6/2009 | 7/6/2009 4:15:13 PM | P | PASS |
|
|
Jesse--Knock on the door or call for access information Phone #: ###-#### Ok final
|
ESC09-00307
| General Inspection | 7/6/2009 | 7/6/2009 | 7/6/2009 4:14:29 PM | P | PASS |
|
|
Site looks good
|
ESC09-00307
| Site Preparation | 7/6/2009 | 7/6/2009 | 7/6/2009 4:12:09 PM | P | CANC |
|
|
|
ELE09-01176
| Electrical Rough-In | 7/6/2009 | 7/6/2009 | 7/6/2009 3:29:06 PM | P | PASS |
|
|
jason Phone #: ###-#### Ok to cover.
|
ELE09-01177
| Permanent Service | 7/6/2009 | 7/6/2009 | 7/6/2009 2:37:04 PM | P | PASS |
|
|
rocky Phone #: ###-#### Ok final. No esc permit.
|
ELE09-00305
| Final | 7/6/2009 | 7/6/2009 | 7/6/2009 1:08:17 PM | P | PASS |
|
|
Katie Phone #: ###-#### Ok final. Notified Katie of outside GFCI line and load reversed and needed changed. no esc permit.
|
ELE09-00716
| Final | 7/6/2009 | 7/6/2009 | 7/6/2009 12:46:10 PM | P | PASS |
|
|
###-#### Internet Inspection Request from: Todd Holbrook Ok final
|
ESC09-00134
| General Inspection | 7/6/2009 | 7/6/2009 | 7/6/2009 12:44:22 PM | P | PASS |
|
|
site looks good. sign posted
|
ESC09-00152
| General Inspection | 7/6/2009 | 7/6/2009 | 7/6/2009 10:15:57 AM | A | PASS |
|
|
Ok, Notified that they need to post sign.
|
ELE09-01171
| Temporary Service | 7/2/2009 | 7/6/2009 | 7/6/2009 10:15:34 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton Needs to change out 50 amp 2 pole breakers to GFI.
|
ELE09-00586
| Final | 7/2/2009 | 7/6/2009 | 7/6/2009 10:00:59 AM | A | PASS |
|
|
This inspection for a heat pump hook up can be inspected outside. Enter from alley to view new 200a panel and heat pump. Call Dave at ###-#### prior to inspection. Phone #: ###-#### Internet Inspection Request from: Dave Friend Ok final. No esc permit.
|
ELE09-01024
| Final | 7/6/2009 | 7/6/2009 | 7/6/2009 9:59:56 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/6/2009 at 6:43:35 AM. Contact: ###-####. Ok final, no esc permit.
|
ELE09-01135
| Permanent Service | 7/2/2009 | 7/6/2009 | 7/6/2009 9:13:37 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Robert Murray Exterior service ok.
|
ESC09-00179
| General Inspection | 7/6/2009 | 7/6/2009 | 7/6/2009 9:09:48 AM | A | PASS |
|
|
Site looks ok, sign posted.
|
ELE09-00931
| Final | 7/3/2009 | 7/6/2009 | 7/6/2009 8:28:12 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/3/2009 at 10:29:00 AM. Contact: ###-####. ok final. esc already finaled
|