Inspections for the day of: Monday, July 6, 2009.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-00301 FIRE-Final Inspection7/2/20097/6/20097/7/2009 1:53:38 PMACANC
It appears that the mezzanine/storage is shown on the plans as existing. Per Jason it is new. Jason and I agreed to waite until Forrest is back to continue this inspection.
BLD09-00566 FIRE-Final Inspection7/2/20097/6/20097/6/2009 3:31:35 PMPFAIL
Two doors that have not been shown on the city approved plans have not been installed yet on the first floor. I told mike, the job superintendant, that the doors and hardware would need to be installed prior to my sign off and that the building inspector may require resubmittals showing the two new doors. All exit signs and emergency lights functioned and the fire extinguishers are good till the end of the month. The second floor remodel area life safety is passed.
FIR09-00248 INSP-Sprinkler Rough-in/Hydro7/5/20097/6/20097/6/2009 3:28:43 PMPPASS
overhead hydro bldg J passed.
FIR08-00835 INSP-Sprinkler Rough-in/Hydro7/6/20097/6/20097/6/2009 3:27:57 PMPFAIL
The provided city approved plans did not include the new pendants in the scope of work. Per the head legend the pendants are "future". New plans are required that include the pendants within the scope of work.
BLD09-00893 FIRE-Final Inspection7/2/20097/6/20097/6/2009 10:35:08 AMAPASS
Life safety passed. The hood suppression system has been re-certified.