BLD09-00945
| FIRE-Final Inspection | 7/6/2010 | 7/6/2010 | 7/7/2010 9:55:40 AM | P | PART |
|
|
The existing fire alarm devices tested ok in Phase 11.
|
FIR04-00655
| INSP-Conference | 6/16/2010 | 7/6/2010 | 7/6/2010 3:35:46 PM | A | DONE |
|
|
Per Bill this will be called in within the next day or two.
|
FIR10-00308
| INSP-Final Inspection | 7/6/2010 | 7/6/2010 | 7/6/2010 3:20:26 PM | P | CANC |
|
|
This re-inspection is being cancelled due to time constraints.
|
FIR10-00175
| INSP-Final Inspection | 7/6/2010 | 7/6/2010 | 7/6/2010 3:17:43 PM | P | FAIL |
|
|
The scope of work has been completed but Alarmco has installed an AES panel without applying for a permit. When Alarmco has applied, been issued and the permit finaled this permit can be finaled. Also Jeremy is fire caulking the new penatration out of the riser room. A hydro test will be required per NFPA 13 - 24.2.1.5. Will be verified at final.
|
FIR10-00199
| INSP-Final Inspection | 7/6/2010 | 7/6/2010 | 7/6/2010 2:52:12 PM | P | FAIL |
|
|
The scope of work has been completed but Alarmco has installed an AES panel without applying for a permit. When Alarmco has applied, been issued and the permit finaled this permit can be finaled.
|
FIR09-00013
| FIR-Aging Inspection | 7/6/2010 | 7/6/2010 | 7/6/2010 10:41:06 AM | | NR |
|
|
Per Bill the scheduling of all of the AES projects is being addressed.
|
FIR09-00076
| FIR-Aging Inspection | 7/6/2010 | 7/6/2010 | 7/6/2010 10:40:38 AM | | NR |
|
|
Per Bill the scheduling of all of the AES projects is being addressed.
|
FIR10-00220
| INSP-Sprinkler Rough-in | 7/2/2010 | 7/6/2010 | 7/6/2010 10:36:47 AM | A | PASS |
|
|
See the city approved plans for locations marked "ok" where the sprinkler piping can be covered.
|
FIR10-00308
| INSP-Final Inspection | 7/6/2010 | 7/6/2010 | 7/6/2010 10:03:44 AM | P | FAIL |
|
|
The doors have not been connected to the PAM relay/FACP. When tested the doors did not operate.
|