ESC11-00439
| Complaint Inspection | 7/6/2011 | 7/6/2011 | 7/6/2011 3:23:24 PM | P | PASS |
|
|
Dust "reasonable practices" are being done during demo, according to contractor asbestos has been removed according to EPA, will contact complaintee, Brandon.
|
ESC09-00352
| General Inspection | 7/6/2011 | 7/6/2011 | 7/6/2011 2:14:11 PM | P | PASS |
|
|
Rock check dam center section has been lowered to drain water, after talking to Brent from Wetlands he will re-install rock if needed during Walling mitagation work. Park section has not been seeded but should be very soon, irragation is ready to turn on.
|
ESC10-00600
| General Inspection | 7/6/2011 | 7/6/2011 | 7/6/2011 1:19:46 PM | P | PART |
|
|
Project completed except establishment of vegetation, conditions are to dry to expect this area to achieve growth, will see what grows in the fall after receiving moisture.
|