FIR11-00159
| INSP-Sprinkler Rough-in | 7/6/2011 | 7/6/2011 | 7/6/2011 4:50:43 PM | P | PASS |
|
|
Only a small area of the second floor near the escalator is ok for cover. The other areas do not have the T-bar or the pendant heads installed. I let Joe know that what appears to be soffits at the outer edge of the sales floor may cause obstructions to the sprinkler coverage when installed.
|
BLD10-01693
| FIRE-Final Inspection | 7/6/2011 | 7/6/2011 | 7/6/2011 4:48:46 PM | P | PASS |
|
|
Life safety passed
|
BLD10-01875
| FIRE-Final Inspection | 7/6/2011 | 7/6/2011 | 7/6/2011 12:24:14 PM | P | FAIL |
|
|
Life safety can be finaled when the elevator recall functions have been corrected or an upgrade agreement with the Boise Fire Dept. has been reached.
|
BLD11-00926
| FIRE-Final Inspection | 7/6/2011 | 7/6/2011 | 7/6/2011 12:09:06 PM | A | CANC |
|
|
Cancel per Todd Kurns since the plans have not been resubmitted.
|
FIR11-00014
| INSP-Final Inspection | 7/5/2011 | 7/6/2011 | 7/6/2011 12:08:32 PM | A | FAIL |
|
|
Permit can be finaled when the elevator recall functions have been corrected or an upgrade agreement with the Boise Fire Dept. has been reached.
|
FIR11-00289
| INSP-Sprinkler Rough-in | 7/5/2011 | 7/6/2011 | 7/6/2011 12:06:16 PM | A | PASS |
|
|
The sprinkler piping on the east side of the fire wall, first floor, is ok to cover.
|
BLD11-01089
| FIRE-Conference | 7/6/2011 | 7/6/2011 | 7/6/2011 10:01:40 AM | A | DONE |
|
|
Amy did not arrive but another lady did and I let her know that Gordan with the Boise Fire Dept was ok with a 30 day temporary occupancy as long as the door hardware and the fire sprinklers were addressed. This would leave the fire alarm modifications needing to be completed.
|
FIR11-00234
| INSP-Final Inspection | 7/6/2011 | 7/6/2011 | 7/6/2011 9:59:56 AM | A | PASS |
|
|
Permit finaled. Revised drawings to be provided showing the wall and candella changes.
|