FIR12-00206
| INSP-Final Inspection | 7/6/2012 | 7/6/2012 | 7/6/2012 5:11:32 PM | P | PASS |
|
|
Previous correction items verified for completion. Fire sprinkler permit final approved.
|
BLD10-02771
| FIRE-Final Inspection | 7/6/2012 | 7/6/2012 | 7/6/2012 3:17:43 PM | P | PASS |
|
|
Final fire life safety inspection completed satisfactory. Contractor to repair one EM discharge light above the main entry/exit as discussed.
|
FIR12-00314
| INSP-Sprinkler Rough-in | 7/6/2012 | 7/6/2012 | 7/6/2012 1:51:01 PM | A | PART |
|
|
Overhead fire sprinkler rough-in at the additional office area okayed.
|
BLD10-02771
| FIRE-Conference | 7/6/2012 | 7/6/2012 | 7/6/2012 1:47:58 PM | A | DONE |
|
|
Regarding life safety conditions for final occupancy approval.
|
FIR11-00496
| INSP-Conference | 7/6/2012 | 7/6/2012 | 7/6/2012 1:47:06 PM | A | DONE |
|
|
Regarding off site monitoring.
|
BLD12-00441
| FIRE-Final Inspection | 7/3/2012 | 7/6/2012 | 7/6/2012 1:46:04 PM | A | FAIL |
|
|
Door hardware at the main entry/exit and the second exit needs revised, one exit sign is not functional on battery backup, both exit discharge lights need repaired.
|