PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, July 6, 2012
.
Number of inspections:
11
Percentage of inspections complete:
91 %
Percentage of inspections not complete:
9 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC12-00173
Aging Inspection
6/29/2012
6/29/2012
ESC12-00488
Site Preparation
7/6/2012
7/6/2012
7/9/2012 10:19:52 AM
PASS
ESC12-00672
Site Preparation
7/6/2012
7/6/2012
7/6/2012 2:21:15 PM
NR
ESC12-00688
Site Preparation
7/6/2012
7/6/2012
7/6/2012 2:05:13 PM
PASS
ESC12-00177
Aging Inspection
7/6/2012
7/6/2012
7/6/2012 12:32:53 PM
PASS
ESC12-00036
General Inspection
7/6/2012
7/6/2012
7/6/2012 12:32:12 PM
PASS
ESC12-00666
Site Preparation
7/6/2012
7/6/2012
7/6/2012 12:31:51 PM
NR
ESC11-00117
General Inspection
7/6/2012
7/6/2012
7/6/2012 12:31:39 PM
PASS
ESC10-00495
General Inspection
7/6/2012
7/6/2012
7/6/2012 12:31:27 PM
FAIL
Verbal to RP:
Stabilize all disturbed slopes at a minimum. With installing sediment barriers along the pads to slow the potental run off to the slopes. Will follow up next week for a schedule update.
ESC12-00067
Tracking Control
7/6/2012
7/6/2012
7/6/2012 10:11:41 AM
A
FAIL
Verbal to RP:
Clean up all tracking onto the hard surfaces. Provide stabilized accesses at the two entry points onto the jobsite. Will follow up on 7/10/12 AM
ESC11-00176
BMP Violation
7/5/2012
7/6/2012
7/6/2012 9:44:33 AM
A
PART
Verbal to RP;
Clean up all trash and sediment on a daily basis. Make sure all contractor utilize thewashout pit for ALL non storm water wash water from paint, stucco, mortar, and sheet rock mud. If found that the follow issued are violated, a stop work order will be issued at the time the violation is found. It will be up to the inspector discression to place on the lot the violation is found or on the whole subdivision.