Inspections for the day of: Friday, July 6, 2012.
Number of inspections: 11
Percentage of inspections complete: 91 %
Percentage of inspections not complete: 9 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00173 Aging Inspection6/29/20126/29/2012   
ESC12-00488 Site Preparation7/6/20127/6/20127/9/2012 10:19:52 AM PASS
ESC12-00672 Site Preparation7/6/20127/6/20127/6/2012 2:21:15 PM NR
ESC12-00688 Site Preparation7/6/20127/6/20127/6/2012 2:05:13 PM PASS
ESC12-00177 Aging Inspection7/6/20127/6/20127/6/2012 12:32:53 PM PASS
ESC12-00036 General Inspection7/6/20127/6/20127/6/2012 12:32:12 PM PASS
ESC12-00666 Site Preparation7/6/20127/6/20127/6/2012 12:31:51 PM NR
ESC11-00117 General Inspection7/6/20127/6/20127/6/2012 12:31:39 PM PASS
ESC10-00495 General Inspection7/6/20127/6/20127/6/2012 12:31:27 PM FAIL
Verbal to RP:
Stabilize all disturbed slopes at a minimum. With installing sediment barriers along the pads to slow the potental run off to the slopes. Will follow up next week for a schedule update.
ESC12-00067 Tracking Control7/6/20127/6/20127/6/2012 10:11:41 AMAFAIL
Verbal to RP:
Clean up all tracking onto the hard surfaces. Provide stabilized accesses at the two entry points onto the jobsite. Will follow up on 7/10/12 AM
ESC11-00176 BMP Violation7/5/20127/6/20127/6/2012 9:44:33 AMAPART
Verbal to RP;
Clean up all trash and sediment on a daily basis. Make sure all contractor utilize thewashout pit for ALL non storm water wash water from paint, stucco, mortar, and sheet rock mud. If found that the follow issued are violated, a stop work order will be issued at the time the violation is found. It will be up to the inspector discression to place on the lot the violation is found or on the whole subdivision.