Inspections for the day of: Monday, July 6, 2015.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00255 INSP-Supply line flush7/6/20157/6/20157/6/2015 3:26:48 PMPPASS
Underground flush passed
BLD13-03597 FIRE-Final Inspection7/6/20157/6/20157/6/2015 3:13:43 PMPPASS
life safety passed
BLD13-03595 FIRE-Final Inspection7/6/20157/6/20157/6/2015 3:09:42 PMPPASS
Life safety passed
BLD15-01747 FIRE-Final Inspection7/6/20157/6/20157/6/2015 2:16:37 PMPFAIL
Provide functional exit signs/emergency lights as per the approved plans. Provide single action hardware on the new/modified doors as discussed.
BLD15-02152 FIRE-Final Inspection7/2/20157/6/20157/6/2015 1:38:58 PMPFAIL
No city approved plans on site. I noted that the two exit signs and all of the emergency lights in the DIning area appeared in-operative.
BLD14-03090 FIRE-Final Inspection7/2/20157/6/20157/6/2015 12:05:56 PMAFAIL
Provide approved plans and small documents, provide sticker at main exit, provide fire extinguishers as discussed, remove exit sign leading people from the office through the storage/warehouse.
BLD15-02000 FIRE-Final Inspection7/2/20157/6/20157/6/2015 12:03:47 PMAFAIL
Repair exit sign/emergency light at the front exit door, provide tagged fire extinguishers mounted as discussed, repair or remove existing emergency lights, provide exit signs/emerency lights as shown on the approved plans, provide single action hardware on the warehouse #4 and #5 exit doors, provide racking permit for the high piled storage/racks in warehouse #4.
BLD15-00199 FIRE-Final Inspection7/1/20157/6/20157/6/2015 8:32:12 AMACANC
Jeff is canceling until the project related fire alarm permit can be scheduled.
BLD14-03296 FIRE-Final Inspection7/2/20157/6/20157/6/2015 8:14:18 AMACANC
Per Nate and I's conversation this inspection is to be rescheduled for when the hvac contractor can be on site for the testing of the duct smoke detectors.