Inspections for the day of: Monday, July 6, 2015.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorThomas Walsh
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00531 INSP-Sprinkler Rough-in/Hydro7/6/20157/6/20157/6/2015 2:19:47 PMPPART
Trip test of dry pipe valve supplying sprinklers in the fitness area, including the are below the pool/spa. Also tested fire alarm interface including water flow, tampers, and low-air test - All tested OK. Following these tests, the system was put on a 2 hour hydrotest, which also passed.
NOTE: This completes the tests to all of the systems for the entire building. Final inspections are pending completion of Towers 3 and 4 areas.
FIR14-00430 INSP-Sprinkler Rough-in7/2/20157/6/20157/6/2015 2:15:51 PMAPART
Completion of the 24 hour air test of the the three dry pipe systems protecting the parking garage and fitness area. PASSED
Conducted a trip test of the two dry systems protecting the parking garage. The system to the north flowed at 90 seconds, while the system to the south flowed at 50 seconds.
Also tested fire alarm interface of these systems, including water flow, tampers, low-air, etc. All tested OK.
FIR13-00725 INSP-Sprinkler Rough-in/Hydro7/6/20157/6/20157/6/2015 1:53:37 PMPPASS
Hydrotest of dry pipe valve supplying standpipe for stair A01, which is located in the above grade parking garage.
PASSED
FIR13-00167 INSP-Sprinkler Rough-in/Hydro7/2/20157/6/20157/6/2015 1:50:58 PMPCANC
This is the wrong permit # called in for a diferent part of the building. See FIR 13-00725 for the proper permit and the inspection for today (7/6).
FIR13-00167 INSP-Sprinkler Rough-in7/2/20157/6/20157/6/2015 1:49:15 PMPPART
24 hour air test of four (4) dry pipe valves located in the U/G parking garage, including the water room, pump room and two systems supplying the north end PG. All measured 43 psi @ 11:30am. Will retest tomorrow - same time to ensure pass.
Also hydrotest - 200 psi @ 2 hrs - for dry pipe valve supplying two different hose valves in the PG. - PASSED