Inspections for the day of: Wednesday, July 6, 2016.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-02338 FIRE-Final Inspection7/5/20167/6/20167/6/2016 1:18:43 PMPPASS
life safety passed
FIR15-00709 INSP-Sprinkler Rough-in/Hydro7/5/20167/6/20167/6/2016 1:16:01 PMAPART
4th floor hydro test passed. 3rd, 2nd and the standpipes failed due to visible loss on guages.
BLD15-01869 FIRE-Conference7/6/20167/6/20167/6/2016 8:44:47 AMADONE
Pressure was 62psi this morning
FIR15-00822 INSP-Conference7/6/20167/6/20167/6/2016 8:44:23 AMADONE
Pressure was 62psi this morning
FIR16-00164 INSP-Final Inspection7/5/20167/6/20167/6/2016 8:43:27 AMAPASS
Permit finaled