BLD16-02338
| FIRE-Final Inspection | 7/5/2016 | 7/6/2016 | 7/6/2016 1:18:43 PM | P | PASS |
|
|
life safety passed
|
FIR15-00709
| INSP-Sprinkler Rough-in/Hydro | 7/5/2016 | 7/6/2016 | 7/6/2016 1:16:01 PM | A | PART |
|
|
4th floor hydro test passed. 3rd, 2nd and the standpipes failed due to visible loss on guages.
|
BLD15-01869
| FIRE-Conference | 7/6/2016 | 7/6/2016 | 7/6/2016 8:44:47 AM | A | DONE |
|
|
Pressure was 62psi this morning
|
FIR15-00822
| INSP-Conference | 7/6/2016 | 7/6/2016 | 7/6/2016 8:44:23 AM | A | DONE |
|
|
Pressure was 62psi this morning
|
FIR16-00164
| INSP-Final Inspection | 7/5/2016 | 7/6/2016 | 7/6/2016 8:43:27 AM | A | PASS |
|
|
Permit finaled
|