PLM17-01748
| PLM-Aging Inspection | 7/6/2018 | 7/6/2018 | 7/9/2018 10:19:46 AM | | PART |
|
|
Left a message for the contractor to call.
|
PLM18-00954
| Final | 7/6/2018 | 7/6/2018 | 7/6/2018 4:33:18 PM | P | PART |
|
|
If you need access to the house the code is 1234 Phone #: ###-#### Inspection requested via web by randy calkins. The plumbing final is on hold until the Landscape contractor makes corrections to the backflow assembly. All plumbing under this permit is ok.
|
PLM18-02086
| Sprinkler (Final) | 7/6/2018 | 7/6/2018 | 7/6/2018 4:32:01 PM | P | FAIL |
|
|
This permit was reactivated due to the risers coming up on an angle. The PVB must be in the vertical position.
|
PLM18-02842
| Plumbing Rough-in | 7/5/2018 | 7/6/2018 | 7/6/2018 4:06:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jason Gonzalez
|
PLM18-02843
| Plumbing Rough-in | 7/5/2018 | 7/6/2018 | 7/6/2018 4:05:50 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jason Gonzalez
|
PLM18-02801
| Plumbing Rough-in | 7/5/2018 | 7/6/2018 | 7/6/2018 3:10:42 PM | P | PART |
|
|
rough-in ; Partial Groundwork. If questions contact Jerry Prough @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann. Break room sink wall ok to cover. 4" drain from break room gw ok. Fill with clean fill.
|
PLM18-02758
| Plumbing Rough-in | 7/5/2018 | 7/6/2018 | 7/6/2018 2:57:46 PM | P | PASS |
|
|
JOB # 19804 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM18-02707
| Water Heater Final | 7/6/2018 | 7/6/2018 | 7/6/2018 2:36:41 PM | P | PASS |
|
|
|
PLM18-02157
| Water Heater Final | 7/6/2018 | 7/6/2018 | 7/6/2018 2:17:44 PM | P | PASS |
|
|
Jessica Flicker is owner ###-#### Phone #: ###-#### Inspection requested via web by Heidi Lukecart
|
PLM18-02023
| Plumbing Rough-in | 7/6/2018 | 7/6/2018 | 7/6/2018 1:54:32 PM | P | PASS |
|
|
JOB CONTACT - MATT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
PLM18-02715
| DOC - Permit Finaled | 7/6/2018 | 7/6/2018 | 7/6/2018 1:11:32 PM | P | PASS |
|
|
|
PLM18-00731
| Other | 7/6/2018 | 7/6/2018 | 7/6/2018 11:43:34 AM | A | PASS |
|
|
|
PLM18-01162
| Final | 7/5/2018 | 7/6/2018 | 7/6/2018 8:26:05 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Baker. 1. The T&P drains are trapped in the crawl. Raise the drain and run through the floor joists to the exit bay. 2. The T&P termination must 90 down. 3. Cap the feed line in the crawl to the abandoned vacuum breaker.
|
PLM17-00942
| PLM-Aging Inspection | 7/6/2018 | 7/6/2018 | 7/6/2018 7:47:20 AM | | PASS |
|
|
|
PLM17-00942
| DOC - Permit Finaled | 7/6/2018 | 7/6/2018 | 7/6/2018 7:47:07 AM | P | PASS |
|
|
water line complete
|