Inspections for the day of: Friday, July 7, 1995.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC95-00056 INSP - Final7/7/19957/7/19957/7/1995 12:00:00 AM PASS
FINAL FURN/W/H 20 MIN
MEC95-00056 INSP - Gas pressure test7/7/19957/7/19957/7/1995 12:00:00 AM PASS
#26150
MEC95-00094 INSP - Hoods7/7/19957/7/19957/7/1995 12:00:00 AM PASS
#26151
MEC95-00149 INSP - Framing/ Rough-in7/7/19957/7/19957/7/1995 12:00:00 AM FAIL
NEEDS CORRECTIONS 30 MIN
MEC95-00149 INSP - Gas pressure test7/7/19957/7/19957/7/1995 12:00:00 AM PASS
#26148
MEC95-00150 INSP - Framing/ Rough-in7/7/19957/7/19957/7/1995 12:00:00 AM PASS
OK 15 MIN
MEC95-00055 INSP - Final7/7/19957/7/19957/7/1995 12:00:00 AMAPASS
FURN W/H OK
MEC95-00055 INSP - Gas pressure test7/7/19957/7/19957/7/1995 12:00:00 AMAPASS
GAS OK 26143 25 min
MEC95-00134 INSP - Gas pressure test7/10/19957/7/19957/7/1995 12:00:00 AMAPAS
26141 20 min.
MEC95-00134 INSP - Final7/10/19957/7/19957/7/1995 12:00:00 AMAPAS
gas equipment is set and gas flex hooked up. final 20 min.
MEC95-00135 INSP - Framing/ Rough-in7/7/19957/7/19957/7/1995 12:00:00 AMAFAIL
R/I FAILED CORRECTIONS: ALL RETURN-AIR TO BE DUCTED BACK TO THE RTU. NEED W/H VENT AND COMB-AIR TO W/H ROOM SIZED FOR BTU LOAD. 35min